BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in De Leon, Texas. Completed plans call for site work for a water / sewer project.

This project includes approximately 1,115 LF of new 6" PVC sewer line and associated appurtenances. The project to be constructed will be financed in whole or part, by federally awarded funds to the City of De Leon from the American Rescue Plan Act and is subject to all applicable Federal and State laws and regulations. Attention is called to the fact that, not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual orientation, gender identity, or national origin. Adherence to the grant recipient's Section 3 Policy is required for all contracts and subcontracts. SAM.gov registration is required to Bid. All contractors/subcontractors that are debarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project. This will be verified upon receipt of bid and prior to the award. Minority Business Enterprises, Small Business Enterprises, and Women Business Enterprises, and Historically Underutilized Business firms are encouraged to submit bids. The City of De Leon reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by City of De Leon for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. The lobbying certification must be submitted with the bid packet to be considered complete and responsive. The City of De Leon is an Equal Opportunity Employer. Construct work as described in the Contract Documents. 1. Provide materials, equipment, and incidentals required to make the project completely operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete project. 3. Provide the civil, architectural, structural, mechanical, electrical, instrumentation and all other work required for a complete and operable project. 4. Test and place the completed project in operation. 5. Provide the special tools, spare parts, lubricants, supplies, or other materials as required for the operation and maintenance of the Project. 6. Drawings and Specifications may not indicate or describe all of the work required to complete the project. Additional details required for the completion of the project are to be provide by the CONTRACTOR and coordinated with the ENGINEER.

Bid Results

Water / Sewer

$110,000.00

Public - City

Site Work

7

13

5

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
14
Bidding Soon
804
All Active Projects
297
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

June 26, 2023

img_map_placeholder

Hwy 6, De Leon, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.