Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Chickasha, Oklahoma. Completed plans call for site work for a water / sewer project.

Description: Installation of approximately 1,040 LF 6-inch water main by trenching, approximately 10 fire hydrant assemblies and approximately 30 gate valves with boxes. Location of Work: Various Locations in Chickasha, OK 1 6" PVC WL, TRENCHED 2 6" X 6" MJ TEE, INSTALLED 3 6" X 45 MJ BEND, INSTALLED 4 6" MJ GATE VALVE W/ BOX, INSTALLED 5 FIRE HYDRANT ASSY (4'-6" BURY) INSTALLED 6 PAVEMENT REPAIR 7 REPLACE CURB AND GUTTER 8 DISINFECTION 9 HYDROSTATIC PRESSURE TESTING 10 CONSTRUCTION TRAFFIC CONTROL MBE (6.9%), WBE (6.9%) completion- 150 consecutive calendar days

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

23

7

7

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
86
Bidding Soon
875
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

July 3, 2023

Project location map

Multiple Locations, Chickasha, OK


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed