Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a stadium in Winnipeg, Manitoba. Completed plans call for the renovation of a stadium.
During the last week of June, the city announced new investments into the two indoor ice arenas in the St Vital ward — those at Glenwood Community Centre and the St. Vital Arena. The ice at Dakota and Southdale community centres is well used by St. Vital residents, but they are both outside St. Vital ward. The arena at Glenwood CC (formally known as Moffat Arena) will receive an $82,000 grant from the city to upgrade its underground piping in order to keep ice in at the arena for 12 months, instead of 10 months at present. The city also announced that from June 20 to July 20, the St. Vital Arena will undergo a $115,000 mould abatement project, focusing on the wooden ceiling. The grant to Glenwood adds to a provincial government grant, and some money from the community centre itself. The funds will also cover electronic upgrades, a second dehumidifier and a new, larger condenser. This is the fourth major investment in the Glenwood rink since I was first elected in 2011. Back in 2013, I joined St. Boniface MP Shelly Glover and St. Vital MLA Nancy Allan in a $400,000 grant to bring better heating and humidity control into the arena. I later used $10,500 in ward funds to purchase a new score clock, and in 2020 I was pleased to combine money from the city budget and some ward funds totalling $104,000 for new arena glass. St. Vital Arena has similarly been the recipient of four major investments during my period as a councillor. In 2018 we announced the completion of a $400,000 city investment, highlighted by a new Zamboni and modernizing the change rooms (then-Coun. Scott Gillingham, a rec hockey player, told me the change-room upgrades eliminated a problem with scalding hot showers). In 2020, the city and province invested $40,000 in exterior upgrades. In 2022, the city made major upgrades to the ice-making plant with a grant of $210,000 for computer control improvements. I was never much of a hockey player, but I have skated at these arenas, cheered on high school hockey and watched my sons take skating lessons. They are an important part of the St. Vital community, and I am pleased to help ensure they will be serving the public for years to come. ----------------------------------------------------------------------------------------------------------------------------------------- The Work to be done under the Contract shall consist of removal of mould from the wood ceiling and related surfaces at 580 St Anne's Road - St Vital Arena in accordance with Scope of Work provided by Pinchin Ltd. Dated May 1, 2023. The major components of the Work are as follows: (a) Complete a mock-up of power wash/media blast in an area designated by the Contractor for approval by Contract Administrator or City of Winnipeg representative/s which will serve as example of quality of work expected on the rest of the ceiling and related surfaces. (b) Power Wash or Media Blast the wood ceiling and related surfaces to achieve desired level of cleaning without causing unnecessary damage to the corresponding wood finishes and related surfaces. (c) Supply and installation of a surface coating of Fosters Sheer Defense 40-51 Mould Resistant Clear Coat to the underside of the roof deck (including any corresponding beams, joists, purlins, etc.) throughout the Arena / Ice Surface area of the building. Protect adjoining surfaces and equipment for any overspray, etc. (d) All Works to be done in accordance with 349-2023_Scope of Work_R2.pdf. (e) Clean up. The funds available for this contract are $125,000.00. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Award
Arenas / Stadiums
$94,209.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
May 23, 2023
June 1, 2023
July 28, 2023
580 St Anne's Rd, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: May 26 2023
Winnipeg, MB
Bid Date: May 18 2023
Winnipeg, MB
Bid Date: May 25 2023
Winnipeg, MB
Bid Date: May 30 2023
Winnipeg, MB
--
Winnipeg, MB
Bid Date: May 18 2023
Winnipeg, MB
--
Winnipeg, MB
Bid Date: May 19 2023
Winnipeg, MB
Bid Date: May 30 2023
Winnipeg, MB
Bid Date: May 29 2023
Winnipeg, MB
Bid Date: May 26 2023
Winnipeg, MB
Bid Date: May 16 2023
Winnipeg, MB
Bid Date: May 24 2023
Winnipeg, MB
Bid Date: May 24 2023
Winnipeg, MB
Bid Date: May 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--