EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2023 at 8:00 PM

Updated June 14, 2025

Site work and paving for a mixed-use development in Pingree Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project includes Neighborhood 15 from Lookout Drive to Wester Boulevard and Cape Cod Lane from Lookout Drive to the dead end cul-de-sac, as well as the Promontory Drive/Diamond Head Trail loop off of Cape Cod Lane. Improvements include HMA pavement removal & replacement, concrete sidewalk, curb removal and replacement, and ADA ramp installations. ALTERNATE #1 - Alternate Bid #1 includes all of the Base Bid and then adds Neighborhood 22: Spinnaker Street from Diamond Head Trail to just past the Spinnaker Street loop. Improvements include HMA pavement removal and replacement, concrete sidewalk, curb removal and replacement, and ADA ramp installations. ALTERNATE #2 - Alternate Bid #2 includes all of the Base Bid and Alternate Bid #1 and adds Neighborhood 16A: Leeward Lane/Wester Boulevard from the intersection of Catamaran Circle to Reinking Road, as well as the Whitecaps Court cul-du-sac. Improvements include HMA pavement removal & replacement, concrete sidewalk, curb removal and replacement, and ADA ramp installations. Pre-Qualification:Yes Est. Completion Date: Sept. 1, 2023

Bid Results

Roads / Highways

$403,307.00

Public - City

Paving, Site Work

35

8

22

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
153
Bidding Soon
2,430
All Active Projects
951
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2023

June 19, 2023

img_map_placeholder

Multiple Locations, Pingree Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.