Site work and renovation of a mixed-use development in Las Vegas, Nevada. Completed plans call for site work for a water / sewer project; and for the renovation of a detention facility.

The "Project" of which the "Work" of the Contract is a part titled Pecos Bonanza DJJS Detention Units E6-E8 - Full Plumbing Replacement and is located at 651 N. Pecos Rd. Las Vegas , Nevada 89101. The "Work" is described in the Project Drawings and Divisions 01, 02, 03, 08, 09 and 22 of the Project Manual. The Work consists of the construction of the removal and replacement of Drain Waste Vent/Water piping and associated plumbing fixtures withing DJJS units E6, E7, and E8. Construction includes all administrative work as outlined in the Division 01 General Requirements, Division 02 Existing Conditions, Division 03 Concrete, Division 08, Openings, Division 09 Finishes and Division 22 - Plumbing and the following using materials noted on Drawings and Specifications: Units E6 Demolition: Removal of all domestic water and sewer piping and vent lines; (4) shower room fixtures and (1) employee restrooms with associated fixtures. Includes sawcutting and hydro excavation for underground plumbing lines up to 10' from building, haul away and disposal. Unit E6 Building Construction: Installation of new domestic water piping and sanitary sewer lines, vent piping valves, plumbing fixtures and all associated hardware; back fill and concrete repairs; patching and painted at CMU walls and soffit area. Includes escalation and phasing. Unit E7 Demolition: Removal of all domestic water and sewer piping and vent lines; (4) shower room fixtures and (1) employee restrooms with associated fixtures. Includes sawcutting and hydro excavation for underground plumbing lines up to 10' from building, haul away and disposal. Unit E6 Building Construction: Installation of new domestic water piping and sanitary sewer lines, vent piping valves, plumbing fixtures and all associated hardware; back fill and concrete repairs; patching and painted at CMU walls and soffit area. Includes escalation and phasing. Unit E8 Demolition: Removal of all domestic water and sewer piping and vent lines; (4) shower room fixtures and (1) employee restrooms with associated fixtures. Includes sawcutting and hydro excavation for underground plumbing lines up to 10' from building, haul away and disposal. Unit E8 Building Construction: Installation of new domestic water piping and sanitary sewer lines, vent piping valves, plumbing fixtures and all associated hardware; back fill and concrete repairs; patching and painted at CMU walls and soffit area. Includes escalation and phasing. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Cutoff Date: 5/15/2023 08:00 PM (ET)

Award

Jails / Prisons

$2,345,180.00

Public - County

Renovation, Site Work

11

18

27

6

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
15
Bidding Soon
386
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

July 31, 2023

img_map_placeholder

651 N Pecos Rd, Las Vegas, NV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.