Site work for a water / sewer project in Spokane Valley, Washington. Conceptual plans call for site work for a water / sewer project.

This agreement will be for approximately one year in duration. Consultants will be considered for the following project. The City reserves the right to amend terms of this """Request for Qualifications""" (RFQ) to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses.Project DescriptionProposed work will develop the existing 30% design documents approved by the Department of Ecology to a completion status as specified below. This project will improve stormwater quality through installation of low impact development (LID) stormwater management techniques including but not limited to: bio-infiltration swale facilities, tree/planter box bio-retention facilities, and/or cartridge media treatment facilities. These facilities will be located along Sprague Avenue from University Road to Park Road. Sprague Avenue is a five-lane principal arterial in a fully developed commercial zone. Both sides of the roadway have an eight to twelve foot wide landscape area with mature trees. Extensive utility coordination is anticipated. Stormwater from the roadway is currently discharged directly to drywells. The scope of this project includes retrofitting existing infrastructure with LID facilities. In addition to LID facilities, work is expected to include applicable design elements for asphalt and curbing revisions, reducing roadway width to three lanes, landscaping and irrigation, street/pedestrian lighting, and multi-modal facility improvements including signalized crossing(s) of Sprague Avenue and potential transit stop upgrades.The work to be performed by the CONSULTANT consists of preparing the necessary final design documents. Documents must consider that the project will be delivered in at least two distinct segments with two unique purposes:1) 2024 construction of Sprague Avenue between University and Herald Roadsa. Provide 100% plans, specifications, and estimates required for a full bid package,b. Project must account for multiple funding sources and project considerations:i. Federal funds: Coronavirus Local Fiscal Recovery Fund (CLFR),ii. Non-Federal Funds: Washington State Department of Transportation (WSDOT) funding for a signalized pedestrian crossing between City Hall and Balfour Park,iii. Non-Federal Funds: Spokane Transit Authority funding for overall segment improvements,iv. incorporate the Ecology-approved design report element.2) 2023-2024 Ecology grant eligibility for future construction funding of Sprague Avenue between Herald and Park Roadsa. Ecology acceptance of the 90% Design Package by June 30, 2024,b. Construction years will depend on funding available. Currently, this segment does not have any secured construction funds.Final design services include:1) Additional Surveying (if needed)2) Geotechnical recommendations3) Stormwater design report documents4) Environmental documentation and preparation of permit applications5) Preparation of plans, specifications, and estimates for construction bid documents as needed to deliver the two segments described above6) Bid supportThe City reserves the right to retain the services of the successful firm for any subsequent phases (CN) associated with this project.Evaluation CriteriaSubmittals will be evaluated and ranked based on the following criteria:1) Qualification of Proposed Project Manager and Team2) Experience of the Proposed Project Manager and Team3) Approach to project management4) Approach to schedule5) Approach to quality control6) Organization & Clarity of the proposa

Conceptual

Water / Sewer

$653,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
106
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2024

img_map_placeholder

To Be Determined, Spokane Valley, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.