BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Bartelso, Illinois. Completed plans call for site work for a water / sewer project.

Furnish all labor, materials, and equipment required to install approximately 2,600 LF of 4" and 6" diameter water main and all appurtenances in various locations throughout the Village. The work shall be completed in accordance with the specifications and drawings covering the work. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to August 2023. All questions shall be directed to John A Wieter at HMG Engineers, Inc. at (618) 577-2240 or jwieter@hmgengineers.com. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Bid Results

Water / Sewer

$212,219.00

Public - City

Site Work

16

18

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
92
Bidding Soon
1,315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

July 24, 2023

Project location map

Multiple Locations, Bartelso, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.