BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a residential development in Valemount, British Columbia. Conceptual plans call for the construction of a residential development; and for site work for a residential development.

The Village is seeking proposals for a fourplex housing unit. The following are key building design considerations which determine the overall suitability of the project: 1. The Project is to be based off the following concept information: 2. The proposed 4 units will consist of: a. 1 - three bedroom "family" unit, 2 bathrooms; and b. 2 - two bedroom "self-contained" units with own bathroom and shared common areas (kitchen, living room); and c. 1 - one bedroom OR two bedroom unit. 3. Because this will be a publicly owned asset with a long expected functional lifespan, the life- cycle costs place a priority value on quality, durability and energy efficiency embodied in building materials and systems. The exterior materials and finishes are to be of high quality and detailed to withstand the climate of the north. Exterior finish selection should give attention to durability consistent with high quality housing and minimize ongoing maintenance costs. Proponents may look to the Village of Valemount Community Plan multi-family design guidelines and Valemount Zoning Bylaw for appropriate material specifics. 4. The interior materials and finishes are to be of good quality with attention to livability and durability consistent with high quality housing (see BC Housing Design Guidelines). 5. Roof shapes should give the development a friendly experience from the street with a preference to peaked roofs. 6. Project should meet or exceed the national Energy Code for part 3 building or national building code for part 9 building. 7. Area should be designed to accommodate a garbage bin for multi-unit housing. 8. Landscaping to be of low maintenance and consider xeriscaping. Performance Bond At time of Building Contract, the proponent must submit a 50% performance bond for all labor and materials. Question Deadline 05/19/2023 The village reserves the right to extend the Closing Time at its sole discretion. Proposals are to be submitted electronically. Late submissions will not be considered or evaluated and will be returned to the proponent. The village reserves the right to alter the schedule at its sole discretion if required. Cancelled - All bids over budget. Plans to re-tender has not been determined.

Project Abandoned

Residential Subdivision

$500,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
145
All Active Projects
55
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2023

July 6, 2023

img_map_placeholder

Multiple Locations, Valemount, BC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.