BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a transportation facility in Gig Harbor, Washington. Working plans call civil work for a runway / taxiway.

Taxiway Relocation & Stormwater Improvements - Storm Drain Inlet Protection, CSPP Compliance and SPCD, Fill, Cap, and Abandon Existing Pipe , Remove Valley Gutter, Remove Drainage Structure ,Asphalt Pavement Removal, Pavement Pulverization, Paint Marking Removal, Lighted Sign Demolition , Remove Tree, Crushed Aggregate Base Course, Asphalt Surface Course , Catch Basin Type 1, Catch Basin Type 2 48 In. Diam., Adjust Manhole or Catch Basin, 8' Chain-Link Fence, 4' Pedestrian Gate with Concrete Pad, 20' Double Swing Gate with Concrete Pad FAAAIPNos.3-53-0076-023-2022&3-53-0076-024-2023 The DBE goal for this project is 9.24% Goals for minority participation for each trade: 6.2% Goals for female participation in each trade: 6.9% Contract Time The number of calendar days or working days, stated in the proposal, allowed for completion of the contract, including authorized time extensions. If a calendar date of completion is stated in the proposal, in lieu of a number of calendar or working days, the contract shall be completed by that date.

Final Planning

Transportation Terminals

$13,943,625.00

Public - County

Paving, Site Work

43

17

34

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2023

August 1, 2023

Project location map

1202 26th Ave NW, Gig Harbor, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.