BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Chapel Hill, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of September 12, 2023, this project has not yet been awarded. A timeline or award has not yet been established. Pursuant to the General Statutes of North Carolina, Section 143-129, sealed proposals are invited and will be received by the Town of Chapel Hill for the furnishing of all materials, labor, equipment, and construction of EB-5721, consisting of one contract having the following principal items: DESCRIPTION: Fordham Boulevard (US 15-501) Sidepath - Consists of constructing a 10'- foot sidepath along Fordham Boulevard (US 15-501) from Ridgefield Road to Willow Drive (approximately 1,800 linear feet) and to upgrade the existing sidepath from Cleland Drive to Ridgefield Road (approximately 1,700 linear feet). The construction will involve clearing and grubbing, grading, concrete paving, drainage, erosion control, curb and gutter installation, signing, signal adjustments, and striping. The Project Manager for this project is Mr. Bill Webster, Town of Chapel Hill. All requests for interpretations related to this RFB must be submitted in writing to the Project Manager at bwebster@townofchapelhill.org by June 30, 2023. For questions on the bidding procedures, contact the Town's Purchasing Division at 919-969- 5022. The Project Manager for this project is Mr. Bill Webster, Town of Chapel Hill. All requests for interpretations related to this RFB must be submitted in writing to the Project Manager at bwebster@townofchapelhill.org by June 30, 202 The Town of Chapel Hill reserves the right to waive any informality, to reject any and all bids, and to award a contract which, in its judgement, is the best interest of the Town of Chapel Hill

Bid Results

Roads / Highways

$2,495,254.00

Public - City

Paving, Site Work

319

6

4

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
144
Bidding Soon
1,716
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2023

August 16, 2023

Project location map

Fordham Blvd, Chapel Hill, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.