BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Chapel Hill, North Carolina. Completed plans call for the renovation of a 317,529-square-foot library.

The University of North Carolina at Chapel Hill (hereafter referred to as the University) seeks proposals from qualified firms to plan an upcoming move of the University's special collections currently residing in Wilson Library in support of the upcoming Infrastructure Upgrade project. Project Budget $31,185,830 CIP: 21404 - Item: 42123-342-4U42 The move planning will consist of both identifying parts of the special collection that will be temporarily as well as permanently stored off site. The selected firm, at the direction of the UNC Facilities PM, will coordinate with the design team - led by Hanbury Architects - the University, Wilson Library, and other stakeholders in the development of this plan and the requirements of moving the special collections, including doing inventory of the collection, identifying off site storage, scheduling, identifying routes from within the stacks to the loading dock, requirements and parameters of the means and methods of the move, as well as other variables identified throughout the planning process. This process will be completed with the selected firm compiling a set of bid documents that the University will use to ultimately select the firm who will execute the move through the UNC Procurement Services office via RFP submission. This set of bid documents will likely include narratives, processes and procedures, diagrams, photos, etc. necessary to effectively communicate the plan and intent of the move. Additionally, the move planner will need to account for additional items and areas in this effort. This includes, but will not be limited to, general building furniture as well as the Conservation Lab, and Digital Production Center - both of which have specialized equipment. It will be the move planner's responsibility to fully understand and communicate the requirements of this special equipment when moving and storing and communicating that clearly and explicitly in the bid documents. Wilson Library is a 317,529 GSF building originally constructed in 1929, with subsequent additions in 1953 and 1977. The stacks occupy 10 floors of 7-foot-tall ceiling spaces with overhead lighting, ducts, and sprinkler systems. The University has been working with the North Carolina Department of Insurance on a coordinated plan to bring the Wilson Library into compliance with the current edition of the building code. The approved upgrades are to provide code compliant egress for the entire building and new mechanical systems within portions of the original 1929 stacks and the stacks of the 1953 addition. The schedule of the Infrastructure Upgrade project has construction targeted to start in mid-2025 and completed by late 2026. The special collections will need to be moved out before construction starts - exact timing will be established during the move planning effort. There was an Advanced Planning Report completed in March of 2023 detailing all potential scope of the project and will be used as the basis of design for the Infrastructure Upgrade project. Included in that effort was a programming planning study done that will be referenced for future uses and visioning of Wilson Library and shall be a factor in determinations made in this move planning effort.

Post-Bid

Library

$31,185,830.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
45
Bidding Soon
1,242
All Active Projects
515
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

August 30, 2023

img_map_placeholder

208 Raleigh St, Chapel Hill, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.