This is a service / maintenance or supply contract in Beckley, West Virginia. Contact the soliciting agency for additional information.

Page 10 of 13 STATEMENT OF WORK Semi-Annual Tuning Service for Fire Tube Boilers General Scope: This project consists of testing, inspecting, checking, and adjusting combustion gas and oil settings on Scotch Marine Boilers (3 Each) at VAMC Beckley, WV, per IAW Boiler Safety Device Testing Manual, 7th Edition (January 2023), and VHA Directive 1810 (January 2023). This is a base year +4 optional year(s) contract. This is a semi-annual service that requires multi-day trips to complete boiler tuning service. This exercise requires a certified Fireye Burner controls installer/repair technician. Technician must follow recommended test procedures prescribed by BEI Safe Steaming Device Testing Manual 7th Edition. Check low water cutoff alarm system. Check low water shunt switch. Check auxiliary low water cutoff alarm system. Check auxiliary low water shunt switches. Check high and low water alarms. Check high steam pressure cutouts. Check steam safety valves (x2) each boiler. (Lift pressures are 120psi and 125psi per boiler.) Check flame scanner. Check high and low gas pressure switches, adjust if necessary. Check high and low oil switches, adjust if necessary report final settings. Check all combustion air switches and purge switches, adjust if necessary. Adjust burner combustion settings and calibrate oxygen trim on each fire tube boiler. Perform Yearly accumulation test on each boiler Check all gas vents for leaks. Check gas fuel safety shut off valves proof of closure. Check fuel oil safety shut off valves proof of closure. Check operation of Liquid Petroleum Gas Pilot. Check Low Oxygen alarm and/or cutout. 19. Check vibration of burner fans semi-annually at each tuning. Check, Adjust, and Record (on final report) timing parameters for (Pre-purge, Post-purge, Ignitor, Main Flame Ignition, and Flame Out). Calibrate instrumentation, monitoring, and control systems. Check Furnace pressure Check Combustion gas leaks into boiler room. Calibrate and Test O2 monitoring system for entire boiler plant, adjust as necessary for tuning purposes, provide calibration documentation along with tuning documentation. Provide site visit reports documenting all discrepancies, adjustments, and final settings of tuned, calibrated, and adjusted parameters. Place of Performance: Tasks will be performed in the boiler plant at the VAMC Beckley, WV in accordance with VA Master Specifications. Work will be in an occupied healthcare facility in operation 24 hours a day and care must be provided to keep work areas clean and contained. *The contractor will be responsible for storage of materials and disposal of all unused materials. **The contractor will ensure that all sub-contractors meet and abide by all government regulations and requirements to include 30 hour OSHA training for superintendent and 10 hour OSHA training for workers. The method of Contractor Selection has not been Determined at this time.

Post-Bid

Medical

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
30
Bidding Soon
352
All Active Projects
166
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2023

July 14, 2023

img_map_placeholder

200 Veterans Ave, Beckley, WV

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.