BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2023 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a bridge / tunnel in Rosebud, North Dakota. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.

The work consists of the Removal and Replacement of an existing bridge crossing The Little White River, at 43.2020 Long and -100.9677 latitude 687 feet West of BIA Route 5 on BIA Route 3 on the Rosebud Indian Reservation. The new structure is a Single Span Precast Bulb Tee Bridge, 97.6ft. total length. The construction period for the contract will begin following issuance of the Notice to Proceed no later than September 11, 2023 and shall be (Substantial Complete) no later than December 15, 2023.

Post-Bid

Bridges / Tunnels

$800,000.00

Public - Federal

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
13
Bidding Soon
183
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

September 11, 2023

Project location map

To Be Determined, Rosebud, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.