Site work and paving for a sidewalk / parking lot in Oxnard, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As more specifically described in the Contract Documents, the Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to construct new concrete sidewalk, curb and gutter, minor road widening, driveway reconstruction, electrical conduit and pullboxes for street lighting, bike lanes, landscaping and irrigation system along Etting Road from E. Pleasant Valley Road to the eastern City Limit. The Work includes the milling of existing asphalt concrete pavement; placement and compaction of asphalt concrete pavement; excavation and reconstruction of a portion of street; concrete works; adjust utility covers to finished grade; installation of storm drain lines and appurtenant concrete structures; and traffic striping. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1 to the Standard Specification for Public Works Construction 2018 Edition (collectively the "Greenbook") is incorporated by this reference. As more specifically described in the Contract Documents, the Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to construct new concrete sidewalk, curb and gutter, minor road widening, driveway reconstruction, electrical conduit and pullboxes for street lighting, bike lanes, landscaping and irrigation system along Etting Road from E. Pleasant Valley Road to the eastern City Limit. The Work includes the milling of existing asphalt concrete pavement; placement and compaction of asphalt concrete pavement; excavation and reconstruction of a portion of street; concrete works; adjust utility covers to finished grade; installation of storm drain lines and appurtenant concrete structures; and traffic striping. Contractor must complete all Work within sixty (60) Working Days of the City's Notice to Proceed. There will be a $3,500 assessment for each Calendar Day that Work remains incomplete beyond the Project completion deadline.

Bid Results

Sidewalks / Parking Lot

$2,386,979.00

Public - City

Paving, Site Work

39

5

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
80
Bidding Soon
1,557
All Active Projects
705
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

October 31, 2023

img_map_placeholder

Etting Rd, Oxnard, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.