BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling, renovation and addition to an educational facility in Peoria, Illinois. Completed plans call for the addition of a educational facility; for the remodel of a educational facility; and for the renovation of a educational facility.

Public Notice A. Bid security shall be submitted with each bid in the amount of 5% of the bid SECTION 00 11 13 - ADVERTISEMENT TO BID amount. No bids may be withdrawn for a period of 60 days after the opening of bids. 1.1 PROJECT INFORMATION A. Notice to Bidders: Qualiied bidders may submit bids for the project as described 1.4 PREBID MEETING A. Prebid Meeting: Refer to section 00 25 13 - Prebid Meetings in this Document. Submit bids according to section 00 21 13 Instruction to Bidders. 1.5 RFI'S AND SUBSTITUTION REQUESTS B. Project Identiication: New Berlin - JR/SR High School Remodel & Addition A. All Requests for Information (RFI's) and Submittals shall be sent via e-mail to: 1. Project Location: New Berlin - JR / SR High School Name: Brian Fiedler New Berlin CUSD #16 Firm: CORE Construction Address: 300 W Ellis St 601 SW Water St. Peoria, IL 61602 New Berlin, IL 62670 Phone: (309) 401-7501 E-mail: brianiedler@coreconstruction.com C. Architect: 1. Project Architect: Douglas Draeger B. All RFI's and Substitution request responses shall be made available to all plan BLDD Architects holders via an RFI and Substitution response log which will be distributed via 100 N Merchant St, Decatur, IL 62523 addenda. C. Substitution requests shall utilize the substitution request form included in section D. Construction Manager: 00 43 25 Substitution Request Form and provide all request technical information 1. Construction Manager: CORE Construction Services of Illinois, Inc. required by section 00 43 25. Substitution requests sent without approved form shall 601 SW Water Street not be considered. Peoria, Illinois 61602 D. Substitution requests shall comply with requirements of section 01 25 00 - (309) 404-4700 Substitution Procedures E. Project Description: The overall project consists of additions, remodel and building demolition: 1.6 DOCUMENTS 1. Additions: gym, locker room and storm shelter, convertible band and chorus A. Online Procurement and Contracting Documents: Obtain access after 4/26/2023, rooms, commons and kitchen, and a two-story classroom wing by contacting: 2. Remodel: portions of the adjacent 1970's building Brian Fiedler 3. Building Demolition: to take place after the additions and remodel is complete. CORE Construction Services of Illinois, Inc. 4. The project schedule is to coordinate work with the school's calendar year 601 SW Water Street so the existing building can remain up and operational during the school Peoria, Illinois 61602 year. Phone: (309) 401-7501 E-mail: brianiedler@coreconstruction.com F. Construction Contract: Bids will be received for the following Work: Online access to bid documents via BuildingConnected will be provided to any bidders 1. Multiple Contract Project consisting of the following prime contracts: or suppliers who request access a. Bid Package 03 - Mass Demolition b. Bid Package 04 - Earthwork, Storm Sewer and Asphalt Paving 1.7 TIME OF COMPLETION c. Bid Package 05 - Site Concrete A. Successful bidder shall begin the Work upon receipt of a Notice to Proceed and shall d. Bid Package 06 - Building Concrete complete the Work per the requirements in Speciication Section 00 31 13 - Project e. Bid Package 07 - Steel Schedule. f. Bid Package 08 - Masonry g. Bid Package 09 - General Trades 1.8 STIPULATIONS h. Bid Package 10 - Rooing and Metal Wall Panels A. Owner reserves the right to reject any and all Bids or portion(s) of bid, to waive i. Bid Package 11 - Aluminum, Glazing and Skylights any irregularities in the Bidding, and award contract in the Owner's best interest. j. Bid Package 12 - Metal Studs, Drywall, Insulation, Ceilings and B. Selected bidder is required to provide a satisfactory performance bond and labor Painting & material payment bond covering the full performance of the contract, irrevok. Bid Package 13 - Kitchen Equipment cable letter of credit or other security. The costs of the bonds are to be included l. Bid Package 14 - Fire Sprinkler System in each Bidding Multiple Prime Contractor's bid proposal. m. Bid Package 15 - Plumbing and Site Utilities C. The successful bidder shall be required to comply with all provisions of the acts n. Bid Package 16 - HVAC Systems of the General Assembly of the State of Illinois related to Discrimination, Sexual o. Bid Package 17 - Electrical Systems Harassment, Alcohol Use, Preference to Illinois Workmen, Fair Employment 2. Refer to section 01 12 00 BID PACKAGES for additional information Practices Commission, and Equal Employment Opportunity. D. The successful bidder shall not pay less than the prevailing rates of wages as determined by the Illinois Department of Labor to all laborers, workmen, and 1.2 BID SUBMITTAL AND OPENING A. The Owner will receive sealed lump sum bids until the bid time and date at the mechanics performing work under this contract, and shall comply with the re location given below. The Owner will consider bids prepared in compliance with the quirements of the Illinois Prevailing Wage Act (820 ILCS 130/1-12). All Bidding Instructions to Bidders issued by Owner, and delivered as follows: Multiple Prime Contractor bonds shall include a provision as will guarantee the faithful performance of such prevailing wage clause as provided by this bid speci 1. Bid Date: 5/24/2023 ication or contract. 2. Bid Time: 10:00:00 AM., local time. E. Bidding Multiple Prime Contractors shall comply with all applicable laws of the 3. Location: New Berlin - Elementary School - 600 Cedar St, New Berlin, State of Illinois and the United States of America. IL 62670 B. DO NOT SUBMIT BIDS ELECTRONICALLY 1.9 NOTIFICATION C. Bids will be thereafter publicly opened and read aloud. A. This Advertisement for Bids document is issued by CORE Construction Services of Illinois, Inc. NB: 5-4 1.3 BID SECURITY

Post-Bid

Educational

$5,588,000.00

Public - City

Addition, Remodeling, Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
40
Bidding Soon
557
All Active Projects
236
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2023

July 24, 2023

img_map_placeholder

601 Southwest Water Street, Peoria, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.