BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Woodland Park, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of July 7 ,2023 the project was awarded to A1 Chipseal Co and Rocky Mountain Pavment LLC for $453,604.07. Reference Number 0000306446 Question Acceptance Deadline 05/22/2023 06:00 PM EDT The Contractor shall provide street and parking lot striping at various locations within the City of Woodland Park, per the itemized list provided in the bid package. Any and all additional striping must be approved by the City of Woodland Park, prior to work being performed and will be paid for at the same unit prices. All paint shall be SETFAST SOLVENTBORNE ACRYLIC TRAFFIC MARKING PAINT. Glass beads are required for all pavement markings within streets. Glass beads are not required in parking lots. A copy of the paint manufacturer's specifications shall be provided to the City at the time of award of the contract. The Contractor is responsible for providing all equipment, materials and labor to complete the work outlined in this scope of work. The Contractor shall provide all necessary and required traffic control measures to complete the work, without causing unnecessary impacts or delays to the traveling public. All surfaces shall be sufficiently cleaned prior to painting. No painting will be permitted if the temperature of both ground and air are less than 40F, or if the surface is wet. The Contractor shall be responsible for correcting any striping that has been opened to traffic prior to proper drying time, or which has been damaged by weather. The City will be conducting numerous pavement maintenance operations (i.e., full depth reclamation/mill and overlay) during the period of performance of this contract. Coordination with the City for scheduling of maintenance will be required and may require more than one mobilization.The City Wide Striping will be per the attached Master Striping Inventory. City Wide Crackseal, Chipseal, and Fogseal As part of the City of Woodland Park Pavement Management Plan, the City is seeking sealed bids to crack seal, chip seal, double chip seal and City Wide Striping select City streets in 2023. The scope is to complete treatments for 2023 from the attached Chip and Fog Seal Maps and Lists. The Contractor is responsible for providing all equipment, materials and labor to complete the work outlined in this scope of work. All work shall be done in accordance with the Standard Specifications for Chip seal Applications and the City of Woodland Park Engineering Standards. The Contractor shall provide all necessary and required traffic control measures to complete the work, without causing unnecessary impacts or delays to the traveling public. The Contractor shall be responsible for correcting any damaged chip seal applications that have been opened to traffic prior to proper drying time, or which have been damaged by weather. The City will be conducting numerous pavement maintenance operations (i.e., full depth reclamation/mill and overlay) during the period of performance of this contract. Coordination with the City for scheduling of maintenance will be required and may require more than one mobilization. General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - License Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 50 % - Labor and Materials Bond 50 %

Award

Roads / Highways

$453,604.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
33
Bidding Soon
825
All Active Projects
349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2023

June 29, 2023

img_map_placeholder

Multiple Locations, Woodland Park, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.