BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Umatilla, Florida. Completed plans call for the renovation of a clubhouse / community center.

a. Remove and replace all vinyl cove base molding. b. Remove and replace all vinyl composite tile - New tile to be cleaned, sealed, and have three coats of wax applied at completion to provide an aesthetically pleasing appearance. c. Remove and reinstall existing kitchen cabinets and countertops. Cabinets have several chipped areas and some doors that need to be replaced. Include this work with laminate to match as close as possible and repair or replacement of hardware as needed to ensure proper operation at completion of project. d. Remove and reinstall bathroom stall partitions as needed to perform work. e. Remove and replace existing water heater to match existing size and voltage requirements. f. Remove and reinstall existing fixtures, appliances, and equipment as needed to perform work. g. Remove and reinstall all hardware, doors, door frames, thresholds, grab bars, accessories, escutcheons, appurtenances, etc. as needed to perform work. h. Repair doors that are rubbing as needed. i. Remove and replace urinal trap. j. Install ADA trap covers on wall hung sinks in restrooms. k. Remove and replace damaged hose bib on exterior of building. l. Remove and replace all subflooring in its entirety. Flooring shall be replaced with 3/4" BC plywood. Option pricing shall be provided for the use of Fiber cement structural flooring (min. 3/4" thick) installed per manufacturers' specifications. m. All unsupported edges shall receive 2x blocking. n. Clean existing metal ductwork inside of the building - Note: the HVAC equipment and the duct work from the HVAC units to the connection on the exterior of the building has been replaced and needs to be protected during this operation. o. Remove and replace all insulation and moisture barriers under the building to prevent moisture intrusion. Insulation to be R-19 kraft faced batts installed between joists, moisture barrier to be constructed with threaded fibers and shall be designed for this use. All penetrations shall be properly sealed to prevent intrusion. p. Repair drywall, clean, prime and paint all walls and ceilings. All areas except restroom and kitchen walls. Note - Main ceiling was repaired and retextured and will only need to be primed/repainted. See paint specifications. q. Install reinforced fiberglass panels (RFP) on all walls in restrooms and in kitchen. r. Contractor to provide submittals of proposed material to Project Manager for approval prior to installation. s. Clean, prepare, prime, and repaint all exterior surfaces. Surfaces include, but are not limited to walls, doors, trim, mansard roof, etc. See paint specifications. t. Optional pricing shall be provided to remove and replace all pressure treated decking and hand/guardrail material on front and rear ramps and stairs & replace with composite material. u. Once abatement activities have been completed and prior to removal of critical barriers, air samples will be obtained via aggressive air sampling techniques and submitted to a National Voluntary Laboratory Accreditation Program (NVLAP) laboratory for Transition Electron Microscopy (TEM) analysis by NIOSH Method 7402. Consultant will provide the first set of TEM clearance samples at their cost. In the event that these TEM samples fail clearance, the Contractor shall be responsible for the cost of additional TEM clearance sample analysis. Final payment shall only be approved after satisfactory final clearance has been received and approved by Lake County's Project Manager.

Bid Results

Clubhouse / Community Centers

$225,000.00

Public - County

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
104
Bidding Soon
1,462
All Active Projects
600
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

July 31, 2023

img_map_placeholder

17107 Ball Park Rd, Umatilla, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.