Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an office development in San Jacinto, California. Completed plans call for the renovation of an office development.
Phase 1 July 3, 2023 - September 1, 2023: Renovation of SPED Trailer (60-calendar day timeline) Phase 2 July 31, 2023 - October 1, 2023: Renovation of Trailer "A" (60-calendar day timeline) Phase 3 September 11, 2023 - November 1, 2023: Renovation of Trailer "B" (60-calendar day timeline) Phase 4 November 13, 2023 - January 12, 2024: Renovations to District Office main building (60-calendar day timeline). NOTE: Work to be performed after normal business hours, weekends and holidays. location- 2045 S. San Jacinto Ave San Jacinto, CA 92583 District Office: 1) Lactate Room/Office #65: Provide and install new ADA sink/cabinet, includes all plumbing and electrical work and water/drain connections including 1/4 " water line to refrigerator location (not to exceed 12'). Provide and install electric insta-hot water heater (Chronomite SR Standard Flow SR - 30/208). Patch/paint to match existing finishes. 2) Office 48: Provide and install new 36" interior door & frame with District standard hardware. Patch & paint to match existing finishes 3) Office #59: Remove existing wall between room 59 and 60. Remove electrical outlets to nearest junction box. Provide and install new 5' foot exterior door & frame with District standard hardware. 4) Exterior work: Install new 5' wide ADA compliant concrete pathway to room #59 new doorway. 5) Business office/Room 19: Install new walls with two new 36" interior doors/frames with hardware. Include one (1) 36' x 36" operable window. Relocate return air duct, relocate one supply duct, delete one supply duct. Patch & paint to match existing finishes. 6) Soboba Room/Room 26: Install new wall with 36" interior door & frame; Remove two existing walls/doorways. Patch & paint to match existing finishes 7) Room 27: Install two 36" x 72" windows. Install one 36" interior door/frame with District hardware. Patch & paint to match existing finishes. Trailer "A": 1) Per diagram, demo remove existing wall/counter. Prep area for new walls and doorways 2) Install four new walls: wood framing with Chatfield/Clark tack-board "misty gray" over 1/2 "drywall. Include patch and paint to match existing finishes (cove base, trims etc.) 3) Provide and install four new doors and frames with District standard hardware. Include patch and paint to match existing finishes (cove base, trims etc.) 4) Provide and install two (2) new data/voice drops- surface mounted conduit/outlets. NOTE: Includes up to five (5) additional data drops per District discretion. 5) Flooring reinforcement @ file room: Reinforced floor bracing for file storage area (centered @ approx. 6' feet between mod-lines) estimate of 4" x 8" wood post header beams to be used perpendicular to existing floor joists, supported by concrete pier block with Simpson Strong Tie elevated post bracket or equal not to exceed five feet apart and equally distanced. Span support wood post columns shall be 4" x 4" minimum and not exceed 12' feet apart lengthwise and equally distanced. A-35 brackets installed at each floor joist/header contact point. Reinforcement shall be code compliant. 6) Relocate one supply duct to new hallway area - outside of new wall framing (room Jessica). Provide new ceiling tiles and repairs to match existing finishes. SPED Trailer: 1) Per diagram, remove existing speaker above doorway 2) Remove existing telephone line junction panel/box and all unused phone lines 3) Room 4 & 5: Per diagram, remove two existing doors and window frame, wood framing with patch and paint matching wallfinishes (cove base, trims etc.) 4) Rooms 4: Install new 36" interior door and frame and includes District standard hardware. Patch and paint to match existing finishes. Trailer "B" 1) Per diagram, demo/remove existing doors, frames and walls. Remove carpet and cove base. Electrical removed to nearest junction box. 2) Install new walls and doors & frames with District standard hardware per diagram. Wood framing with Chatfield/Clark tack-board "misty gray" over 1/2 "drywall. Include patch and paint to match existing finishes (cove base, trims etc.) 3) Provide and install backing for touch screen monitor at designated locations per detail below. 4) Install new data drops and electrical outlets per diagram - surface mounted at existing walls and located within new walls. NOTE: include six more data drops at District's discretion. 5) Provide and install new carpet and cove base (4" black) per diagram. 6) Relocate one thermostat PID-000834.00018 25882328.1
Bid Results
Office
$225,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
23
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2023
July 3, 2023
2045 S San Jacinto Ave, San Jacinto, CA
Related To This Project
San Jacinto, CA
Bid Date: Feb 24 2021
San Jacinto, CA
Bid Date: Mar 23 2021
San Jacinto, CA
Bid Date: Jun 05 2023
San Jacinto, CA
Bid Date: May 17 2021
San Jacinto, CA
Bid Date: May 25 2021
San Jacinto, CA
Bid Date: Jul 09 2023
San Jacinto, CA
--
San Jacinto, CA
Bid Date: Aug 21 2023
San Jacinto, CA
Bid Date: Apr 18 2023
San Jacinto, CA
Bid Date: May 25 2023
San Jacinto, CA
Bid Date: Apr 07 2023
San Jacinto, CA
Bid Date: May 05 2023
San Jacinto, CA
Bid Date: Mar 30 2023
San Jacinto, CA
--
San Jacinto, CA
Bid Date: Mar 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.