BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Nevada City, California. Working plans call for site work for a playground / park / athletic field.

As of 7/19/2023: This project will not be awarded and will be re-bid in the near future. Furnish all labor, materials, tools and equipment necessary to install BMPs intended to slow the flow of water out of the pit basin. Work includes: construction of access roadway, interceptor swale, rock grade control structure, brush dams and a soldier pile wall at MALAKOFF DIGGINS SHP in Nevada County, California, complete and in accordance with the plans and specifications therefore and such addenda thereto as may be issued prior to bid opening date. Questions and Answers : Any discrepancies, omissions, ambiguities, or conflicts in or among the contract documents or doubts as to meaning shall be brought to the State's attention by including your questions directly on to Merrilee.Byrnes@parks.ca.gov No later then 2 p.m., seven (7) calendar days prior to bid opening date. Answers will be provided by Addendum which is within the Bid Solicitation located on the DGS website stated above. DIRECTIONS: Travel on highway-49 toward Downieville. Turn right onto Tyler Foote Road, stay on the pavement and follow the yellow line to the park. The road changes names a few times (Curzon Grade Road, Back Bone Road), right on Derbec Road, right on North Bloomfield Road. These are not high-speed roads. The park is 26-miles from Nevada City. The bidder agrees to complete all work within ONE HUNDRED TWENTY (120) calendar days from the date of written notice to commence work. Successful bidder shall provide Payment Bond and Performance Bond. Engineer's Estimate: $2,700,000 to $3,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Playgrounds / Parks / Athletic Fields

$3,777,950.00

Public - State/Provincial

Site Work

22

16

37

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
44
Bidding Soon
778
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

August 7, 2023

img_map_placeholder

23579 N Bloomfield Rd, Nevada City, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.