BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Norwalk, California. Working plans call for site work for a water / sewer project.

- Event : 0000027337 Contractor shall provide all necessary materials, supplies, tools, equipment, transportation, licenses, permits, prevailing wages, insurance, bonds, and personnel to: provide the DSH with lead-based paint abatement, building repairs, and painting. (2) site locations: (1) 11401 S. Bloomfield Avenue, Norwalk, CA 90650; & (2) 13200 Bloomfield Avenue. Deadline for Submission of Questions May 23, 2023 2:00PM. The term of any agreement resulting from this IFB is anticipated to be May 26, 2023, through May 25, 2024. Any agreement resulting from this IFB shall have no force or effect until it is signed by both parties and approved by the Department of General Services (DGS), if such approval is required. Performance shall start no later than on the expressed date set by the awarding agency and after all approvals have been obtained and the agreement is fully executed. Contractor shall obtain and maintain a performance bond of not less than the contract price of this Agreement, which shall be executed by a California-admitted surety insurer. Contractor shall provide DSH with a payment bond of not less than the contract price of this Agreement. The bond shall cover the costs of labor and materials provided by Contractor's employees, subcontractors, and suppliers in the event that Contractor fails to pay the costs of labor and materials to those individuals or entities. Should the Contractor fail to commence work at the agreed upon time, the DSH reserves the right to terminate the agreement upon five (5) days written notice to the Contractor. I. Removal of the existing wastewater comminutor control panel, pumps, grinders, controls, and bubbler system. ii. Dewatering, cleaning, and relining of the wetwell. iii. Installation of a new control panel, grinders, pumps, controls, bubbler system, and associated electrical wiring.

Final Planning

Water / Sewer

$169,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
109
Bidding Soon
2,314
All Active Projects
1,033
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2023

August 21, 2023

img_map_placeholder

Multiple Locations, Norwalk, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.