Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Wildwood, Florida. Completed plans call for site work for a water / sewer project.
All bids shall be prepared using the Project Manual and Drawings. Addenda will be sent via e-mail to all documented plan holders up to seventy-two (72) hours before the Bid closing time. The Owner/Engineer is not responsible for delivery of addenda to prospective bidders. DESCRIPTION OF WORK: All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering, and installing all materials, equipment, and services, including labor for the Work, which generally involves the following activities: Construction of new Master Lift Station adjacent to existing Continental Country Club WWTF and construction of approximately 9,400 LF of 8" PVC force main from the current proposed Lift Station northeast through the spray field located east of Continental Boulevard and South of County Road 44. Construction of approximately 9,600 linear feet of 8" PVC force main starting just east of Continental Boulevard and travelling west along the south side of County Road 44. CONTRACT TIME: Construction time to achieve Substantial Completion is 180 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. Total construction duration is 210 consecutive calendar days. All bids shall be prepared using the Project Manual and Drawings. Addenda will be sent via e-mail to all documented plan holders up to seventy-two (72) hours before the Bid closing time. The Owner/Engineer is not responsible for delivery of addenda to prospective bidders. BID SECURITY: A 5% bid security is required for this project, to be submitted with bids. PERFORMANCE AND PAYMENT BOND: The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. engineer's estimate of cost for the Project - $3,744,681.75 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Question Deadline 05/25/2023
Award
Water / Sewer
$3,434,899.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 8, 2023
August 7, 2023
E Co Rd 44, Wildwood, FL
Related To This Project
Wildwood, FL
Bid Date: Jun 23 2023
Wildwood, FL
Bid Date: Jul 06 2023
Wildwood, FL
Bid Date: Jun 27 2023
Wildwood, FL
Bid Date: Jul 14 2023
Wildwood, FL
Bid Date: Jul 06 2023
Wildwood, FL
Bid Date: Jul 20 2023
Wildwood, FL
Bid Date: Jul 21 2023
Wildwood, FL
Bid Date: Feb 22 2021
Wildwood, FL
Bid Date: Feb 27 2020
Wildwood, FL
Bid Date: Jun 06 2023
Wildwood, FL
Bid Date: May 05 2023
Wildwood, FL
Bid Date: Feb 18 2021
Wildwood, FL
--
Wildwood, FL
Bid Date: Feb 06 2023
Wildwood, FL
Bid Date: Apr 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.