BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 18, 2023 at 8:00 PM

Updated August 28, 2025

Renovation of an educational facility in Westford, Massachusetts. Completed plans call for the renovation of a educational facility.

Project Abbot School WWTF Painting Project The base bid work consists of; sandblasting and recoating the steel tanks housing the aerobic rotating biological contactor, and clarifier; sandblasting and recoating the steel catwalk and toeguards between the clarifier and biological reactor tank; replacement of biological reactor tank media, corroded metal treatment tank hardware and supports; replacement of rusted metal grating; and repairing concrete penetrations of biological reactor tank. Add alternatives consist of ; replacement of 3-inch actuator and butterfly valve, eye wash station, and installation of fall protection netting on outdoor effluent tank hatches. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Work includes the following major items: a. Surface Preparation and recoating of existing steel tank surfaces for the clarifier, and aerobic RBC. b. Surface Preparation and recoating of existing steel catwalk and railings between biological reactor and clarifier tanks. c. Replace aerobic RBC 2-inch steel drain nipples (Qty 2). d. Replace steel gratings on catwalk between biological reactor and clarifier tanks. e. Remove and replace process piping mounting hardware and braces. f. Remove and replace RBC electrical box struts and floor fasteners. g. Repair Denitrification Filter PVC pipe concrete penetrations. h. Replace Denitrification Filter media in kind. Add Alternatives: a. Add Alternative 1: Replace UV valve actuator and valve. b. Add Alternative 2: Replace eye wash station. c. Add Alternative 3: Install external pre-treatment tank safety netting Notice to Proceed by no later than June 14, 2023. Substantial Completion - August 23, 2023 Final Completion - September 22, 2023, 30 days after substantial completion. Question Deadline 05/29/2023 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website

Post-Bid

Educational

$300,000.00

Public - City

Renovation

7

15

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
598
Active Projects
258
Bidding Soon
4,174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

June 14, 2023

Project location map

25 Depot St, Westford, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.