EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Westford, Massachusetts. Completed plans call for the renovation of a educational facility.

Project Abbot School WWTF Painting Project The base bid work consists of; sandblasting and recoating the steel tanks housing the aerobic rotating biological contactor, and clarifier; sandblasting and recoating the steel catwalk and toeguards between the clarifier and biological reactor tank; replacement of biological reactor tank media, corroded metal treatment tank hardware and supports; replacement of rusted metal grating; and repairing concrete penetrations of biological reactor tank. Add alternatives consist of ; replacement of 3-inch actuator and butterfly valve, eye wash station, and installation of fall protection netting on outdoor effluent tank hatches. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Work includes the following major items: a. Surface Preparation and recoating of existing steel tank surfaces for the clarifier, and aerobic RBC. b. Surface Preparation and recoating of existing steel catwalk and railings between biological reactor and clarifier tanks. c. Replace aerobic RBC 2-inch steel drain nipples (Qty 2). d. Replace steel gratings on catwalk between biological reactor and clarifier tanks. e. Remove and replace process piping mounting hardware and braces. f. Remove and replace RBC electrical box struts and floor fasteners. g. Repair Denitrification Filter PVC pipe concrete penetrations. h. Replace Denitrification Filter media in kind. Add Alternatives: a. Add Alternative 1: Replace UV valve actuator and valve. b. Add Alternative 2: Replace eye wash station. c. Add Alternative 3: Install external pre-treatment tank safety netting Notice to Proceed by no later than June 14, 2023. Substantial Completion - August 23, 2023 Final Completion - September 22, 2023, 30 days after substantial completion. Question Deadline 05/29/2023 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website

Post-Bid

Educational

$300,000.00

Public - City

Renovation

7

15

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
484
Active Projects
300
Bidding Soon
3,170
All Active Projects
1,486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

June 14, 2023

img_map_placeholder

25 Depot St, Westford, MA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Abbot School Wastewater Treatment Facility Painting Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.