Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 31, 2024 at 8:00 PM
Updated June 1, 2024
Site work for a water / sewer project in Vado, New Mexico. Conceptual plans call for site work for a water / sewer project.
The Mesquite-Brazito Sewer Project 2 has been in construction since 5/2/2022, and the engineering agreement has expired. The project consists of construction of a new wastewater collection system in parts of Mesquite and Brazito, NM. Funds are not currently adequate to construct the entire project as designed, so the scope will include construction administration and observation, post-construction services, new planning documents, funding application support, possibly a small design revision, and bid-phase and construction/post-construction services for a Project 3 to complete the project as designed. Due to federal funding, New Mexico Resident/Resident Veteran Preferences will NOT apply.
Conceptual
Water / Sewer
$400,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
