BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Schaumburg, Illinois. Contact the soliciting agency for additional information.

This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 26, 2023, at 10:00 AM the Region One/District One Office in Schaumburg. Phase I engineering services are required to perform all work associated with the preparation of preliminary engineering and environmental studies (anticipated to be Categorical Exclusion/Project Reports) for the rehabilitation or reconstruction of up to five (5) bridges which may include or be similar to the bridge listed below. Phase I may include preparing complete bridge inspections and reports, data collection, preparation of base maps and mosaics, ground survey, crash analysis, traffic studies, traffic maintenance analysis, drainage studies, cost estimates and all other work necessary to complete Phase I. The following structure is included in this project, S.N. 016-2430: Kedzie Ave over CSXT RR and Wireton Rd, Cook County. The department will furnish the Consultant with any relevant and available information such as crash data, existing and projected traffic data, utility coordination, and right-of-way data, as well as archaeological, historical, wetland, and special waste survey coordination. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Location Design Studies (Reconstruction/Major Rehabilitation) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS) The method of contractor selection has not been determined at this time. IDOT - 3 - RFQ Engineering - Phase I Services, Kedzie Ave Over CSXT Railroad and Wireton Rd, Cook County, Region One/district One.

Conceptual

Bridges / Tunnels

$30,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
203
Bidding Soon
3,969
All Active Projects
1,626
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 24, 2023

November 24, 2026

img_map_placeholder

Multiple Locations, Schaumburg, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.