BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Schaumburg, Illinois. Contact the soliciting agency for additional information.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 26, 2023, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for various Phase II land surveying projects throughout District One. The department will furnish the Consultant with the proposed ROW requirements from Programming/Design, proposed alignment data (preferably CADD file if available), current title commitments, existing ROW plats from P&P archives, checklist, and cover sheets. The Consultant's work shall include field and office resources to prepare statutory plats of highways (Plats of Excess Parcel, Easement, Dedication and Plats of Survey may also be requested), legal descriptions, title commitment review, preparation of Title Commitment Parcel Summary Sheets and field staking in accordance with the current Land Acquisition Policies and Procedures Manual. A copy of the current manual can be found on the IDOT website under Resources/Manuals & Guides. The Consultant must also have a current QA/QC plan in place to review internal work as well as assigned Subconsultant projects. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Surveying) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 9 -RFQ - Various Land Acquisition Phase II Survey Projects, Various Routes, Various Counties, Region One / District One

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
285
Bidding Soon
3,806
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2023

Project location map

Multiple Locations, Schaumburg, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.