BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Bloomington, Illinois. Conceptual plans call for site work for a bridge / tunnel.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 26, 2023, at 10:00 AM at the Region Three/District Five Office in Paris. Phase I/II engineering services are required to provide Phase I and Phase II deliverables including a project report and final contract plans, specifications, and cost estimates for the 3P Designed Overlay of FAP 693 (IL 9) from Arrowsmith Rd to Ford Co Line in McLean County. The project scope includes a designed overlay of IL 9 with spot improvements for shoulder reconstruction, culvert extensions, and a culvert replacement. The Consultant’s Phase I work will consist of preparing a project report. This work may include data collection, cost estimates, traffic management analysis, traffic control plans, crash analysis, stakeholder meetings, field checks, and other related work items required to produce a project report. The Consultant’s Phase II work may consist of preliminary and final roadway plans, special provisions, estimates, ROW plats and plans, 3D model, and any other related work required to complete Phase II. The department will furnish the Consultant with traffic data, existing plans, environmental coordination, utility coordination, survey data, Open Roads Designer (ORD) files, inspection reports, and crash data when available. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 28 - RFQ Engineering - IL 9 From Arrowsmith Rd to Ford Co Line, Phase I/II Project, Mclean County, Region Three/district Five

Conceptual

Bridges / Tunnels

$6,500,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
69
Bidding Soon
1,162
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

Project location map

IL-9, Bloomington, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.