Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Bloomington, Illinois. Conceptual plans call for site work for a bridge / tunnel.
This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 26, 2023, at 10:00 AM at the Region Three/District Five Office in Paris. Phase I/II engineering services are required to provide Phase I and Phase II deliverables including a project report and final contract plans, specifications, and cost estimates for the 3P Designed Overlay of FAP 693 (IL 9) from Arrowsmith Rd to Ford Co Line in McLean County. The project scope includes a designed overlay of IL 9 with spot improvements for shoulder reconstruction, culvert extensions, and a culvert replacement. The Consultant’s Phase I work will consist of preparing a project report. This work may include data collection, cost estimates, traffic management analysis, traffic control plans, crash analysis, stakeholder meetings, field checks, and other related work items required to produce a project report. The Consultant’s Phase II work may consist of preliminary and final roadway plans, special provisions, estimates, ROW plats and plans, 3D model, and any other related work required to complete Phase II. The department will furnish the Consultant with traffic data, existing plans, environmental coordination, utility coordination, survey data, Open Roads Designer (ORD) files, inspection reports, and crash data when available. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 28 - RFQ Engineering - IL 9 From Arrowsmith Rd to Ford Co Line, Phase I/II Project, Mclean County, Region Three/district Five
Conceptual
Bridges / Tunnels
$6,500,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 24, 2024
IL-9, Bloomington, IL
Related To This Project
Bloomington, IL
Bid Date: Jun 16 2023
Bloomington, IL
Bid Date: May 25 2023
Bloomington, IL
Bid Date: Jun 01 2023
Bloomington, IL
Bid Date: Jun 12 2023
Bloomington, IL
Bid Date: Jun 01 2023
Bloomington, IL
--
Bloomington, IL
Bid Date: Jun 22 2023
Bloomington, IL
Bid Date: Aug 04 2023
Bloomington, IL
Bid Date: May 25 2023
Bloomington, IL
Bid Date: May 18 2023
Bloomington, IL
Bid Date: Jun 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.