BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Las Vegas, Nevada. Completed plans call for site work for a playground / park / athletic field.

The City of Las Vegas (Owner) hereby invites qualified firms or individuals (Bidders) to submit Bids for drilling, construction, and testing of a replacement groundwater well (Well 174A), installation and connection of a dedicated pumping system to existing surface distribution and abandonment of the existing well 174 at Floyd Lamb Park, 9200 Tule Springs Road. PWP No: CL-2023-364 Estimate: $ 1,350,000 - $ 1,500,000 Question Cutoff Date: 5/25/2023 08:00 PM (ET) Bidders shall submit the Bid Security with the Bid in the amount of five percent (5%) of the Base Bid pledging that the Bidder will within three (3) business days after issuance of a Notice of Award execute the Owner-Contractor Agreement as required by and furnish the required bonds and insurance required by may be in the form of a cashier s check, certified check or money order provided the instrument is issued in the name of the City of Las Vegas as the payee COMMENCEMENT AND COMPLETION DEADLINE. Time is of the essence in the performance and completion of this Contract. The Contractor shall commence the Work on the date set by the Owner in the Notice to Proceed, and shall achieve Substantial Completion of the entire Work within 120 calendar days thereafter unless modified as provided in the Contract Documents. LIQUIDATED DAMAGES. Time Sensitive Liquidated Damages are provided for in Section 01700 of the Technical Specifications and in Section 6 of the General Conditions in the amount of $1,000 per day for each calendar day the completion of the Work is delayed beyond the completion deadline, or Owner approved extensions thereof. The Owner reserves the right to renegotiate the following markup percentages if the accumulative amounts to which the percentages are applied exceed 20% of the initial awarded Contract Amount. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,421,867.00

Public - City

Site Work

17

19

3

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
374
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2023

August 14, 2023

img_map_placeholder

9200 Tule Springs Rd, Las Vegas, NV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.