BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Springfield, Illinois. Contact the soliciting agency for additional information.

This project requires 21% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 25, 2023, at 10:00 AM at the Bureau of Operations Office in Springfield. Phase II engineering services are anticipated to consist of planning, organizing, and performing detailed structural inspections on simple aluminum span trusses, aluminum cantilever trusses, Vierendeel type steel span trusses, Vierendeel type steel cantilever trusses and bridge mounted sign structures. The number of overhead sign structures to be inspected is approximately 240. The detail structural inspection shall include rating of all components, evaluation of conditions and preparation of an inspection report including a prioritized summary of repairs and recommend the inspection frequency. The use of ultra-sonic testing equipment to spot check the wall thickness of end supports for aluminum trusses and the chords for Vierendeel steel trusses will be required. Precise GPS coordinates of the structures will be required. The Consultant shall provide all manpower, equipment, vehicles, materials, and the appropriate traffic control for each structure to satisfactorily complete the work. The work shall be done in accordance with the Sign Structure Inspection Manual, Sign Structures Manual, the Manual on Uniform Traffic Control Devices, Inspection and Maintenance of Ancillary Highway Structures (FHWA-NHI-130087), and any department policies or procedures governing the work. Except when otherwise permitted by the Engineer, trusses shall be inspected by mounting them from the shoulder. This will require shoulder closure in accordance with Highway Standards and as directed by the Engineer. Freeway lane closures for truss inspection shall be kept to a minimum and will only be permitted by the Engineer on a case-by-case basis where roadway geometry, traffic and other conditions dictate Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Structures (Highway: Typical) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 52- RFQ - Various Phase II Statewide Sign Structure Inspection Projects, Various Routes, Various Counties, Bureau of Operations.

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
30
Bidding Soon
555
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2023

img_map_placeholder

Multiple Locations, Springfield, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.