BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Springfield, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 8% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants to the Prime Consultant will be using are scheduled to attend an initial meeting on July 31, 2023, at 1:00 PM at the Office of Programming and Planning Office in Springfield. The Illinois Department of Transportation’s (IDOT) Office of Planning and Programming (OPP) is seeking a consultant with relevant experience to provide technical assistance and support to the High Speed Rail Commission (HSR). IDOT seeks to use this Consultant to: 1. Create a statewide plan for a high-speed rail line and feeder network connecting St. Louis, Missouri and Chicago, Illinois that includes current existing Amtrak and Metra Services, connects with the cities of Rockford, Moline, Peoria, and Decatur, and uses inter-city bus service to coordinate with the rail line. 2. Conduct a ridership study and shall make findings and recommendations concerning a governance structure, the frequency of service, and implementation of the plan. 3. Develop the Annual Report to the General Assembly and the Governor, no later than December 31 of each year; for each year of 2023-2026. PRIOR STUDIES 2004 – Record of Decision (ROD): Chicago to St. Louis 110 - mph: IDOT completed an Environmental Impact Statement (EIS) for the corridor. The EIS included the provision of highspeed rail service, 110-miles-per-hour, along the existing Chicago-St. Louis Amtrak route south of Dwight. Reference: Illinois High-Speed Rail – Chicago to St. Louis. 2009 – Environmental Assessment for a New Second Track: IDOT prepared and submitted an Environmental Assessment (EA) to the FRA and to receive funding in support of a second mainline track between Chicago and St. Louis. Reference: Illinois High-Speed Rail – Chicago to St. Louis. 2013 – 220 MPH High Speed Rail Preliminary Feasibility Study: IDOT sponsored a research team at the University of Illinois, including the Urbana-Champaign and Chicago Campuses, to study the feasibility of 220 mph high speed rail service from O’Hare Airport through downtown Chicago to Champaign-Urbana and on to St. Louis and/or Indianapolis, including engineering, operational, ridership, economic and financial aspects. Reference: 220 MPH High Speed Rail Preliminary Feasibility Study. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Transportation Studies (Railway Planning) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 56- RFQ - Materials Engineering Consultant (Geotechnical and Physical Test), Various Routes, Various Counties, Region Two/district

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
30
Bidding Soon
555
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2023

img_map_placeholder

Multiple Locations, Springfield, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.