BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Gunnison, Colorado. Completed plans call for site work for a municipal facility.

As of August 29, 2023, this project has awarded to Moody Construction & Sons, Inc amount of $569,722.03. As of June 21 the project has not yet been awarded. A timeline for award has not yet been established . Gunnison County is expanding the cell at the Gunnison County Landfill. As part of this expansion, the following work will be required: o Extension of geosynthetic liner system in Phase 2, Modules 1 and 2 from approximate elevation 8040 feet to 8070 feet. All questions regarding bid documents should be directed to Michael Pretti at mike.pretti@soudermiller.com and will not be accepted after Wednesday, May 31, 2023. No phone questions will be accepted. All prospective bidders will receive electronic copies of contractor questions with appropriate Gunnison County responses by Tuesday, June 6, 2023. Extension of liner system for Modules 1 and 2 includes: o Location of edge of existing geosynthetics liner system and removal of overlying soil and plywood placed during previous construction to protect edge of liner o Backfilling/removal of the existing interim diversion swale/berm located upslope of existing interim liner termination berm in both Module 1 and Module 2 areas o Placement and compaction of soil to form a low hydraulic conductivity foundation layer for the base of the geosynthetics liner system. The new foundation layer shall be tied into the existing foundation layer. Suitable foundation layer material has been stockpiled onsite by the County. o Installing the GCL and splicing new GCL to the existing GCL o Installing the leachate collection system consisting of a geocomposite drainage layer and splicing new geocomposite to the existing geocomposite o Anchor trench installation and backfilling o Constructing the interim liner termination berm at the edge(s) of portions of the lined area (north edge of Module 1 and west edge of Module 2) o Placing the soil operations layer o Regrade a portion of Module 1 east slope upslope of the liner termination as shown in Project Drawings o Repair of approximate 3-foot by 3-foot area of damaged liner along the north edge of Module 1, including operations layer, granular drainage layer, and GCL. All soils materials necessary for the construction of the Modules 1 and 2 liner extension are expected to be available on-site, from existing stockpiles, from materials excavated and screened during the previous construction of Modules 1 and 2, or from in-place materials.

Award

Municipal

$569,722.00

Public - County

Site Work

9

12

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
84
All Active Projects
35
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

July 10, 2023

img_map_placeholder

Multiple Locations, Gunnison, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.