BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Port Orchard, Washington. Design plans call for site work for a playground / park / athletic field.

The proposal is for the construction of a new 4-lane synthetic surface running track at John Sedgwick Middle School. The track area is 20,900 square feet and includes a high jump area and long jump area bringing the total synthetic track surface area to 23,600 square feet. The total disturbed area Is 1.85 acres. The site is outside the urban growth area but within the census urbanized areas for critical drainage. Kitsap County GIS data shows a non-fish bearing stream across the property. However, there was a Stream Delineation Report prepared by Harris Environmental dated August 16, 2022 submitted. The report concluded, the stream was a mapping error and no stream exists on the parcel. Proponent: South Kitsap School District Lead Agency: KITSAP COUNTY Location of proposal: 8995 SE Sedgwick Road, Port Orchard, WA 98366 Kitsap County; 032302-4-002-2004 The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency for consistency with KCC Title 17 Zoning, Title 19 Critical Areas, and Title 12 Stormwater. This information is available to the public on request. This DNS is issued after using the DNS process in WAC 197-11-340. The lead agency will not act on this proposal for 14 days from the date below.Comments must be submitted by March 29, 2023. COMMENTS: 1. The SEPA comment period previously occurred concurrent with the Notice of Application sent out on February 24, 2023. No comments were received. CONDITIONS: 1. Project shall follow Kitsap County Title 12 - Stormwater Control.You should be prepared to make specific factual objections. Contact Katharine Shaffer to read or ask about the procedures for SEPA appeals.

Design

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
49
Bidding Soon
893
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2025

img_map_placeholder

Multiple Locations, Port Orchard, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.