BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 8, 2023 at 7:00 PM

Updated April 10, 2024

Site work and new construction of an educational facility in San Antonio, Texas. Completed plans call civil work for a post-secondary education facility.

As of November 8, 2023, early release package has already started. They are currently on site preparing the site, utilities, underground, and Earthwork. *The original solicitation is listed below for historical reference. The project is a new four level 150,000 sq ft load bearing metal stud student housing project. The building will house 600 beds. The project will be bordered by Barshop Blvd, Margaret Tobin Ave, and Chisolm Hall. The building will be clad with curtainwall, brick, insulated metal panels, and precast concrete. The roof will be PVC. SpawGlass Contractors, Construction Manager at Risk (CMAR) for the UTSA Blanco Hall project is soliciting competitive Bid Proposals for the Early Release Bid Packages including the following scopes of work. o 2.01 Site Clean-up/wheel washing o 2.02 Office Clean-up o 2.03 Street cleaning o 2.04 Traffic control / crosswalk / pedestrian bridging o 2.05 Verify utilities o 2.06 Trailer setup o 2.07 Tree protection o 2.08 Temp fence maint o 2.09 Layout and Dimensional Controls o 2.10 Spoil Removal (piers, utilities, etc) o 2.11 Dewatering o 2.12 Dust Control o 2.13 Pre-pour Prep & Cleaning o 2.14 BIM Coordination o 2.15 Turnkey Concrete o 2.16 Concrete removal/haul off o 2.17 Waterproofing Consultant - Window Testing o 2.18 SWPPP maintenance o 2.19 Site security o 2.20 Daily Housekeeping o 2.21 Earthwork o 2.22 Site utilities o 2.23 Temporary Fencing Contracts for the Early Release Bid Packages will be awarded based on this round of pricing. Selection of trade partners for the early release bid packages will be based on best value evaluation by the Owner and Construction Manager. SpawGlass and University of Texas at San Antonio reserve the right to accept or reject any, and all proposals. Project Description The scope of work for UTSA Blanco Hall is construction of a four story, XXXXXX sf structure with a footprint of XXXX sf to serve as the student housing for the University of Texas at San Antonio. The framing of the structure consists of a concrete podium and cold form metal framing. Questions & Clarifications Due Thursday May 22, 2023 @ 5:00 PM

Post-Bid

Educational

$15,000,000.00

Public - State/Provincial

New Construction, Site Work

61

42

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
64
Bidding Soon
2,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

November 27, 2023

Project location map

To Be Determined, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.