Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in Clayton, North Carolina. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and military facility.
This project consists of construction of an Entry Control Point for SOF on Fort Bragg NC. Project includes secure visitor center/package search area, covered canopy, passive and active secure barriers, and associated infrastructure. This is a Sources Sought/Request for Information only. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to construct an Entry Control Point on Fort Bragg, NC. The scope of this project consists of: SITE WORK: Civil/Site work consists of grading and earthwork associated with the construction of a new building/new guardhouses and associated concrete sidewalks, fencing, storm drainage, stormwater management areas, and erosion and sediment control. Work also includes construction of an access drive and security barriers. Demolition includes miscellaneous site features, fencing, and vegetation. ARCHTECTURAL/STRUCTURAL WORK: Structural and architectural work consists of the construction of a new visitor center building, truck inspection canopy, guard shacks and renovation of the existing guardhouse. Work includes construction/installation of all interior partition walls, doors, finishes, casework, and other structural and architectural elements. The demolition work will include selective demolition within the existing guardhouse. The primary structural systems for the Truck Inspection Canopy and the Guard Shack will be pre-engineered structures. The primary structural system for the Visitor Center will be load bearing concrete masonry unit (CMU) walls, pre-engineered metal roof trusses with a metal roof deck. The structures will be supported by shallow foundations consisting of spread footings for column loads and continuous perimeter strip footings for wall loads. MECHANICAL/PLUMBING WORK: Mechanical work consists of installation of new mechanical equipment to serve the buildings. Work includes installation of air handlers, heat pumps and associated ductwork, piping, diffusers, registers, grilles, exhaust fans, thermostats, controls, and other associated appurtenances. Plumbing work consists of installation of new plumbing fixtures, water heater, piping, drains and associated appurtenances. ELECTRICAL/TELECOMMUNICATIONS/SECURITY WORK: Electrical work consists of installation of new lighting fixtures, switches, receptacles, circuits, disconnects, starters, panelboards, transformers, an emergency backup generator with associated gear, and other appurtenances. Work also includes installation of grounding and lightning protection systems to serve the buildings and canopy. Telecommunications work consists of installation of new telecommunications outlets, cable tray, racks, cabling, switches and other devices as shown on the construction drawings. Work also includes installation of new outside plant cabling consisting of fiber optic cables. Security work consists of installation of all junction boxes, conduit, cabling and other security / intrusion detection related infrastructure. In accordance with FAR 36.204(f) the magnitude of construction for this project will be between $1,000,000.00 and $5,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Sidewalks / Parking Lot
$5,000,000.00
Public - Federal
Demolition, New Construction, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2024
To Be Determined, Clayton, NC
Related To This Project
Clayton, NC
Bid Date: Jun 13 2023
Clayton, NC
--
Clayton, NC
--
Clayton, NC
Bid Date: Dec 14 2023
Clayton, NC
Bid Date: Apr 13 2021
Clayton, NC
Bid Date: Oct 02 2018
Clayton, NC
--
Clayton, NC
Bid Date: Aug 02 2023
Clayton, NC
Bid Date: Aug 16 2023
Clayton, NC
Bid Date: May 30 2023
Clayton, NC
Bid Date: May 18 2023
Clayton, NC
Bid Date: Feb 08 2022
Clayton, NC
--
Clayton, NC
Bid Date: Apr 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.