Renovation of a municipal facility in Lamar, Arkansas. Completed plans call for the renovation of a municipal facility.

Lamar School District HVAC Upgrades in Multiple Buildings on School Campus. BID PACKAGES 01 Heating and Ventilation System NOTE: All subcontractors are required to comply with the Davis-Bacon Act Prevailing Wage Rates. See Section 004 of the Construction Manual. Faxed bids are also acceptable. Please send faxed bid to 479-968-2570 or email to dbrown@vanhornconstruction.com. Refer to the Instructions to Bidders section in the Construction Management Manual for directions on submitting bids. Bids must be based on a lump-sum amount and must be inclusive of all bid package requirements. All bidders must be licensed in the State of Arkansas, as provided by Act 142 of 1967, amended by Act 293 of 1969, and Act 397 of 1971, and Act 546 of 1971, as enacted by the General Assembly of the State of Arkansas. Plans and Specifications, Bid Forms, and Contract Documents may be EXAMINED and/or purchased at the following locations (No partial sets will be issued): Architecture Plus, Inc. 907 South 21st Street Fort Smith, AR 72846 Van Horn Construction, Inc. (Construction Manager) 790 Tyler Road Russellville, AR 72802 Southern Reprographics, Inc. 901 West 7th St. Little Rock, AR 72201 Burris Reprographics, Inc. 113 S. Arkansas Ave. Russellville, AR 72802 Requests for information, clarifications, and questions shall be submitted to the Construction Manager no later than 5:00pm, Tuesday, May 23, 2023. Project engineer shall issue addendums as he deems appropriate to answer questions. Successful bidders providing a complete, responsive, and responsible bid will be required to execute a Subcontract with Van Horn Construction, Inc. which is available for review in the Construction Management Manual. Additionally, bidders must be prepared to provide insurance as specified in the Construction Management Manual. Bidders must comply with regulatory and licensing requirements of the State of Arkansas as well as all other applicable State statutes. To be considered, bidders must be licensed on day of bid opening. By providing a bid, firms accept the obligation to honor bids for a period of 60 days after the bid openings. Subcontractor s attention is called to the Owner s requirement of mandatory background checks of all employees who will physically be on the Owner s property. Please list on your bid proposal the number of employees you will have on site to complete the project. VHC will cover the cost for this listed number. If any additional employees are used, it will be at Subcontractor s expense. The Owner and Construction Manager reserve the right to reject any or all bids, based on availability of funding, to waive formalities in the bids received, to evaluate bids, and to accept any bid or bids which, in their opinion, may be in the best interest of the Owner. Each bid will include a bid bond in the amount of 5% of the total bid offered payable to Van Horn Construction, Inc., if bid exceeds $50,000. It will be in the form of a cashier s check or insurance surety bond using AIA Document A310 with Power of Attorney attached. Bond is to be made payable to Van Horn Construction, Inc. A Performance and Payment Bond or a Material Supply Bond in the amount of 100% of the total amount of the bid, will be furnished by the successful bidder if exceeding $50,000, within ten (10) days after receipt of the Owner s, referred to in this specification, intent to award notice. Failure to furnish the required bonds may cause forfeiture of bid guarantee to the owner as liquidated damages. The Performance and Payment Bond or the Material Supply Bond will be in the amount equal to 100% of the contract price as security for the faithful performance of this contract price and for payment of all indebtedness for labor and materials furnished or performed in connection with this contract. The bond will be written by a surety company which is qualified and is authorized to do business in the State of Arkansas, according to A.C.A. 22-9-402(a)(b) and filing with said bond, his power of attorney as his authority. The bond will be written in favor of the Construction Manager and executed per Arkansas state law. An original and two (2) copies of the bond must be furnished, with power of attorney attached to each.

Post-Bid

Municipal

$400,000.00

Public - City

Renovation

10

10

8

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
28
Bidding Soon
411
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

July 3, 2023

img_map_placeholder

301 Elberta St, Lamar, AR

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.