BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Addition to a mixed-use development in Vancouver, Washington. Completed plans call for the addition of a educational facility.

. Bids will be received as follows: General Contract to prepare the site at Fort Vancouver High School as described in Civil Engineer drawings and specs. This will include installation of erosion control measures, strippings and fine grading of the swale North of the modular. Provide and install compacted gravel underneath portable and install new footings under modulars as described in drawings from Modern Building Systems. Coordinate installation of modular buildings on new foundations by district vendor. Installation of new utilities (power, low voltage, storm drainage) and connect to new modular building. Minor modifications to the modulars, once moved to the site by owner's vendor includes: Adjusting of gutters to drain to the North end and reconnect to two existing downspouts attached to the walls. Remove and dispose of existing downspouts on opposite side, patch gutters, as necessary. GC to include any painting touch up on modulars, as needed, where contract work occurs. Existing ramp and stair assembly to be disassembled from existing modular location at Franklin Elementary School, relocated and re-assembled at Fort Vancouver High School. Construction of new walkways and landings as described in Civil Engineer drawings. All work will be under a single contract, to include coordination with owner provided vendor for relocation of the Modular Classroom unit Prospective bidders will be required to sign in as an account manager to have access to the project documents. Contact J2 BluePrint Plan Center regarding questions or setting up an account or viewing the documents. Printed sets or sheets may be purchased directly from the printer. No bid will be considered unless in complete accord with the instructions to bidders, and submitted upon the official proposal form included in the contract documents. Each bid must be accompanied by bid security in the form of a bid bond, certified bank check, or cashier's check executed in favor of the Owner for not less than 5 percent (%) of the basic bid amount, excluding applicable State of Washington taxes. Bid security shall be forfeited as damages should the bidder neglect or refuse to enter into a contract and provide a suitable bond for performance/payment for labor and materials. This project is considered a Public Works project. Attention of bidders is called to State of Washington statues, regulations and rules pertaining, but not limited to, the following public works projects: non-discrimination in employment and facilities; rates of payment for wages and fringe benefits to workers; forms of bids; bonds, contracts and certificates; restrictions of lien, taxes and retainage; and barrier-free facilities for the handicapped. The Owner reserves the right to waive any informalities and to reject any or all bids. No bidder may withdraw or modify his bid after the time set for the bid opening until after 45 calendar days from bid opening date. Summary Project Description: General Contract to prepare the site at Fort Vancouver High School as described in Civil Engineer drawings and specs. This will include installation of erosion control measures, strippings and fine grading of the swale North of the modular. Provide and install compacted gravel underneath portable and install new footings under modulars as described in drawings from Modern Building Systems. Coordinate installation of modular buildings on new foundations by district vendor. Installation of new utilities (power, low voltage, storm drainage) and connect to new modular building. Minor modifications to the modulars, once moved to the site by Owner's vendor includes: Adjusting of gutters to drain to the North end and reconnect to two existing downspouts attached to the walls. Remove and dispose of existing downspouts on opposite side, patch gutters, as necessary. GC to include any painting touch up on modulars, as needed, where contract work occurs. Existing ramp and stair assembly to be disassembled from existing modular location at Franklin Elementary School, relocated and re-assembled at Fort Vancouver High School. Construction of new walkways and landings as described in Civil Engineer drawings. All work will be under a single contract, to include coordination with owner provided vendor for relocation of the Modular Classroom unit.

Bid Results

Educational

$201,138.00

Public - City

Addition

23

13

8

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
34
Bidding Soon
515
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

June 21, 2023

img_map_placeholder

5700 E 18th St, Vancouver, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.