BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2023 at 8:00 PM

Updated January 29, 2024

Site work and new construction of a fire / police facility in South Sioux City, Nebraska. Conceptual plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

This project is included in the City of Sioux City fiscal year 2024-2028 Capital Improvement Plan. As of May 22, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however funding is allotted to fiscal year 2027. A detailed scope has not been released. The purpose of this project is to construct a Fire Station 2 at the southern end of the city, near the airport, on city owned property with fast access to industry in Bridgeport, Southbridge, and major roadways including Interstate 29 and Highway 75. Response times to the southern ends of Sioux City for fire, rescue, and EMS do not meet standards. This area includes Southbridge, portions of South Bridgeport, airport properties, portions of Highway 75, and Interstate 29. Current agreements are not seen as a long term or permanent solution as the area continues to develop and protection/response warrants increased expectations for timely emergency services. The amounts budgeted are estimates without a design, based on estimated construction costs for a small, two bay metal fire station structure. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

Conceptual

Fire / Police

$641,300.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
58
Bidding Soon
542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

3290 Dakota Ave, South Sioux City, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.