BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in El Paso, Texas. Completed plans call for site work for a water / sewer project.

The project area is located in Northeast El Paso near the intersection of Martin Luther King Jr. Blvd and Loma Real Avenue. These improvements are part of the Northeast Water Master Plan, to meet future demand due to population growth in the Northeast area of El Paso. The Loma Real site will consist of a Type III prestressed concrete ground storage tank with water storage volume of 5 million gallons. A second 5 million gallon ground storage tank will be installed in the future by others (not part of this contract). The Loma Real tank will serve the East High-Pressure Zone and provide suction supply to the proposed Loma Real pump Station. The proposed Loma Real Pump Station will have an initial capacity of 6-million gallons per day and a future ultimate capacity of 10-million gallons per day. The Loma Real tank and pump station will be located on a 9.1-acre property owned by EPWater at Loma Real Avenue near Martin Luther King Jr. Boulevard. The Loma Real Pump Station will supply water to the new Franklin East 1B ground storage tank via a new 30-inch transmission main. The 30-inch transmission main will consist of approximately 3,600 liner feet of approved pipe installed along Loma Real Avenue and will convey water to the proposed Franklin East 1B Tank. The transmission main will include trenchless installation through the Martin Luther King Jr. right of way. The proposed Franklin East 1B tank will be a Type III prestressed concrete ground storage tank with a water storage volume of 3 million gallons. The tank will serve future demands for the lower reaches of the areas east of War Highway and the Stateline in the Franklin East 1 pressure zone. The site will be located on a 5.7-acre property owned by EPWater, east of Martin Luther King Boulevard and Loma Real Avenue Intersection. The total cost for preconstruction and construction services is currently budgeted at $40 million. The Project completion date is estimated to be Summer 2025. Deadline for questions June 19, 2023

Post-Bid

Water / Sewer

$40,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
255
All Active Projects
113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

February 29, 2024

img_map_placeholder

Multiple Locations, El Paso, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.