Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Waterford, Wisconsin. Completed plans call for site work for a playground / park / athletic field.
This Request for Proposal ("RFP") is issued by the Village of Waterford (the "Village"). The purpose of this RFP is to contract with a qualified contractor (the "Contractor") to provide services for the removal and installation of a new shingled roof, Replacing soffit and fascia, new siding material on the south end of the building, and Adding a new soffit and Ceiling System in the open section of the pavilion, ("Project"), in accordance with the terms, conditions, and requirements set forth in this Request for Proposal (the "RFP"). Award of contract no later than June 27,2023 It is the Village's intent to enter into a contract with a Contractor who best demonstrates the ability to provide removal and installation services as described. After review of the proposals, if the Village decides it is not in the best interest to enter into a contract, the Village will notify all Contractors. For the purposes of this RFP, the selected Contractor will be required to work directly with the Village to accomplish the following design requirements: 1. Remove existing roofing, Village to provide dumpster. inspect the condition of existing roof sheathing and framing. Clean up the jobsite daily. 2. Install 6 ft of Owens corning warranty approved ice and water shield, and around all roof protrusions as needed, and along gutters edge as needed. 3. Install new color matched metal drip edge, and gutter apron over the Ice and water shield, install new leaded soil stack covers and a new ridge vent system along the main peak. 4. Install a Owens Corning warranty approved synthetic underlayment and Owens Corning Trudefinition Duration lifetime shingle to color match (Estate Grey) the nearby bathroom building. 5. Install all new trim, facia and soffit in prefinished LP cedar textured boards on the entire building.Vent all soffits as required. Add 2x4 framing as needed to support the soffits. Color to be determined and approved by the village. 6. The interior of the Ceiling in the outdoor pavilion area to be covered with Pro-Rib steel panels. Add 2x4 framing as needed to support the ceiling. 7. Add new LP smart side textured smart siding panels and trim to the south gable end 8. Bidders must do an onsite inspection, measurements, as well as an onsite meeting. Please contact Mike for scheduling. (Contact information in Section 1.02). 9. Obtain all necessary permits. Inspection period for the Pavilion May 10, 2023-June 7 Please contact Mike for scheduling We are requiring each bidder to inspect and measure and meet at the job site before submitting the proposal. Contact Mike Sponholtz, Parks and Facilities Supervisor to schedule the inspection For the purposes of this RFP, the selected Contractor will be required to work directly with the Village to accomplish the following design requirements: 1. Remove existing roofing, Village to provide dumpster. inspect the condition of existing roof sheathing and framing. Clean up the jobsite daily. 2. Install 6 ft of Owens corning warranty approved ice and water shield, and around all roof protrusions as needed, and along gutters edge as needed. 3. Install new color matched metal drip edge, and gutter apron over the Ice and water shield, install new leaded soil stack covers and a new ridge vent system along the main peak. 4. Install a Owens Corning warranty approved synthetic underlayment and Owens Corning Trudefinition Duration lifetime shingle to color match (Estate Grey) the nearby bathroom building. 5. Install all new trim, facia and soffit in prefinished LP cedar textured boards on the entire building.Vent all soffits as required. Add 2x4 framing as needed to support the soffits. Color to be determined and approved by the village. 6. The interior of the Ceiling in the outdoor pavilion area to be covered with Pro-Rib steel panels. Add 2x4 framing as needed to support the ceiling. 7. Add new LP smart side textured smart siding panels and trim to the south gable end 8. Bidders must do an onsite inspection, measurements, as well as an onsite meeting. Please contact Mike for scheduling. (Contact information in Section 1.02). 9. Obtain all necessary permits.
Award
Playgrounds / Parks / Athletic Fields
$35,021.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
June 8, 2023
July 10, 2023
625 S 1st St, Waterford, WI
Related To This Project
Waterford, WI
--
Waterford, WI
Bid Date: Jul 13 2023
Waterford, WI
--
Waterford, WI
Bid Date: Jul 28 2023
Waterford, WI
--
Waterford, WI
Bid Date: Jan 21 2022
Waterford, WI
Bid Date: Mar 22 2024
Waterford, WI
Bid Date: Jul 21 2022
Waterford, WI
Bid Date: Jun 10 2022
Waterford, WI
Bid Date: Jun 30 2022
Waterford, WI
Bid Date: Jun 23 2022
Waterford, WI
--
Waterford, WI
Bid Date: May 17 2022
Waterford, WI
Bid Date: May 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--