BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2019 at 8:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in Waterford, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of October 4, 2019, a general contractor has been selected and the project is currently under construction. State Hwy 20/83 reconstruction, approximately 1.8 miles long, from Buena Park Road to State Hwy 36, plus about 2 blocks of East Main Street from the bridge to Milwaukee Street. The project includes reconstruction of the pavement and bridge on State Highway 20/83 from Buena Park Road to Highway 36 in Rochester. The project also includes East Main Street from Hwy 20/83 to Milwaukee Street.

Under Construction

Roads / Highways

$13,126,300.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
472
Active Projects
264
Bidding Soon
3,318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2019

Project location map

Multiple Locations, Waterford, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.