BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a water / sewer project in Newport Beach, California. Conceptual plans call for site work for a water / sewer project.

The City owns and operates 16 oil wells that were constructed between 1953 and 1958. This project provides funding for maintenance and repairs of Oil Well No.15 in order to extend its service life and maintain production. Project is included in the City of Newport Beach's FY 2025-2031 Capital Improvement Program (CIP). As of December 4, 2025, per the owner, this project is on hold. Information regarding a design team or a general contractor is not available. A firm timeline for construction has not been determined.

Conceptual

Water / Sewer

$250,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
590
Active Projects
297
Bidding Soon
4,096
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

5810 West Coast Hwy, Newport Beach, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.