BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Smithfield, North Carolina. Working plans call for the construction of a 25,000-square-foot educational facility; and for site work for a educational facility.

On behalf of NEUSE CHARTER FACILITIES, I am presenting this Request for Proposal (RFP) for Pre-construction and Construction Management Services for development and construction of approximately 25,000 SF 2-story school facility with steel frame at 909 M. Durwood Stephenson Parkway, Smithfield, North Carolina T1S11 identified as Phase IV of long-range school development and expansion plan. NEUSE CHARTER FACILITIES has authorized a project budget of $ 7 million to construct Phase IV of master plan which shall include a +- 25,000 SF, 2-story school facility. This budget includes site improvements, all professional fees permits and fees, and construction period interest. The architect has been selected for this project and preliminary conceptual drawings have been completed. The architectural firm selected is Design Development Architects of Raleigh, North Carolina. Neuse Charter School is seeking to apply for a $ 5 million dollar loan through USDA and/or conventional lenders, and selected Architectural Firm of Design Development Architects of Raleigh to design a classroom facility containing approximately 25,000 SF in a 2-story building to be constructed on existing Smithfield campus location at 909 M. Durwood Stephenson Parkway, Smithfield, North Carolina. The 26-acre site currently contains Phase I, II & III of the planned campus is currently operating at this location, consisting of a gymnasium, current administration offices, surface parking and several temporary mobile units housing student population.

Final Planning

Educational

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
117
Bidding Soon
1,588
All Active Projects
717
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 2, 2023

August 1, 2023

August 1, 2024

img_map_placeholder

909 Booker Dairy Rd, Smithfield, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.