BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Medford, Massachusetts. Completed plans call for site work for a water / sewer project.

The work of this contract includes, but is not limited to: The replacement of existing lead water service pipe with new copper water pipe. The project includes excavation at the water main, connecting to the existing water main corporation, installation of new copper pipe to the sidewalk, installation of new curb stop and box, and adapter to the existing private side water service. Additionally, new corporation taps may be required at the discretion ofthe owner. Final trench paving and concrete sidewalk restoration is included. -Replace existing lead service pipe from the water main to the curb stop in the sidewalk. Install permeant pavement for all trenches, all sidewalks where excavation takes place are to be restored with concrete. Locations- 115 Fulton Spring Road 117 Fulton Spring Road 129 Fulton Spring Road 131 Fulton Spring Road 92 Saunders Street 68 Saunders Street 38 Saunders Street 36 Saunders Street 187 Fulton Street 193 Fulton Street 223 Fulton Street 229 Fulton Street 257 Fulton Street 259 Fulton Street 281 Fulton Street 289 Fulton Street 409 Fulton Street 463 Fulton Street 527 Fulton Street 29 Gaston Street 45 Gaston Street 69 Gaston Street 75 Gaston Street 93 Gaston Street 97 Gaston Stree Source ID PU.AG.USA.1736143.C14469426 Piggyback Contract No Question Acceptance Deadline - 05/25/2023 01:00 PM EDT Questions are submitted online Yes The City of Medford, led by its Department of Public Works, is accepting sealed bids for the Lead Service Line Replacement Project in Medford, Massachusetts. Buyer's Requirements Participation Requirements - Airport Concessionaires Disadvantaged Business Enterprise (ACDBE) - Business Concern - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Bid Deposit Required - Certified Payroll - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % a. Saw cut roadway trench limits. b. Excavate to identify service material at corporation stop and curb stop. Confirm service material with Owner prior to work commencing. c.If a lead service is identified, proceed with replacing the service line. If a copper service is identified, do not proceed with replacing the service line and back fill the excavation. d. Turn offthe water service at the existing corporation stop. e. Disconnect the water service from the corporation stop. f. Ream the corporation stop. Furnish and install the corporation stop adapter if directed to do so by the Owner. gh. Furnish and install a %" copper whip. i. Furnish and install a %" to 1" compression adapter. j- Furnish and install 1" copper service pipe to one linear foot from the back of sidewalk within the right ofway. Means and methods are at the discretion ofthe contractor. k. Flush waster service for a minimum of 60 seconds. 1. Furnish and install a 1" curb stop. Connect 1" copper to new curb stop. m. Furnish and install a 1" copper whip and connect to back ofnew curb stop. n. Furnish and install a 1 " to %" compression adapter. o. Furnish and install a %" copper whip. p. Flush water service for a minimum of 60 seconds. q. Connect %" copper whip to existing %" private service. r. Turn all corporations and curb stops to on position. s. Furnish and install new curb stop box to finish grade. t. Backfill and compact trench. u. Pave trench, reset curb, install concrete sidewalk. v. Clean up and sweep work area. w. All traffic control is the responsibility ofthe contractor. All asphalt shall be protected until acceptable for traffic loading. x. Surfaces to remain are to be protected and any surfaces damaged shall be replaced by the contractor at no additional expense to the owner.

Bid Results

Water / Sewer

$195,566.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
549
Active Projects
342
Bidding Soon
4,330
All Active Projects
1,826
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 1, 2023

July 3, 2023

September 1, 2023

img_map_placeholder

To Be Determined, Medford, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.