BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 22, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Webster, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Sumter Road Name: Sr 471 Limits: From Sr 50 to Cr 478 Project(s): 43547125201(*) Federal Aid No: D522045B Total Roadway Length: 4.030 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 4.030 Miles Contract Days: 360 Contract Execution Days: 10 The improvements under this contract consist of milling and resurfacing, base work, drainage improvements, curb and gutters, guardrail, traffic signals, signing and pavement markings, lighting, and other incidental construction along SR 70 from East of US 441 to NE 17th Avenue in Okeechobee County. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashiers check, trust company treasurers check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation A 100% Payment and Performance Bond will be required for all projects unless noted otherwise in the project specifications FL DOT - 008 - Bike Path/trail/milling and Resurfacing/base Work

Award

Roads / Highways

$8,448,064.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
344
Active Projects
152
Bidding Soon
2,490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2023

June 3, 2023

Project location map

State Rte 471, Webster, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.