BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Clarksville, Missouri. Completed plans call for site work for a water / sewer project.

LOCK AND DAM 24 SERVICE BRIDGE AND TAINTER GATE REHAB (PIER REHAB) CONTRACTING OFFICE ADDRESS: 1222 Spruce Street, St. Louis, MO 63104 POINT OF CONTACT: Angie Grimes, Contract Specialist, angie.l.grimes@usace.army.mil PROPOSED SOLICITATION NUMBER: W912P9-23-R-0023 OF CONTRACT : Clarksville, Missouri COMPETITION -: Full & Open Competition TYPE OF PROPOSED CONTRACT: Firm Fixed Price (FFP), Request for Proposal (RFP), Quantity (IDIQ) Type of contract with an initial Task Order to be awarded directly to follow the award of the main IDIQ PERIOD OF : 5 years after date of ESTIMATED : between $50,000,000 and $100,000,000 PRODUCT OR SERVICE CODE (PSC): Y1KA - Construction of Dams NAICS AND SIZE STANDARD: The North American Industry Classification System (NAICS) code for this is effort is 237990, Other Heavy and Civil Construction. The Small Business Administration small business size standard for NAICS code 237990 is $45 million average receipts (total or gross income) over the past three years. DESCRIPTION: General Site Description: Lock and Dam 24 (LD24) is adjacent to Clarksville, Missouri, 93.5 river miles upstream from St. Louis and river mile 273.5 on the Upper Mississippi River. The dam has a 16 span service bridge, including 15 eighty foot wide Tainter gate bays and 1 eighty foot wide service yard bay. The service bridge spans rest on concrete piers that separate each bay. The top of dam at LD24 is at elevation 483 and contains 1,340 feet of gated section of dam. Work Statement: Several major components at the LD24 facilities are in need of repair and rehabilitation. Work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane, staged at the gate bays of the dam in which the work is being done. The work will be performed in each bay behind provided bulkheads, which will be installed and removed by the Government. The work includes four main components: New Tainter gate chains and associated machinery The work consists of furnishing all river based floating plant, labor, materials, and equipment for the removal/disposal of the existing Tainter gate lifting chains and associated machinery and installation, , and testing of the new government furnished items. This work also includes structural modifications to the Tainter gates to accommodate the new chains, such as installing Tainter gate chain guide assemblies, testing of welds on Tainter gate chain guide assemblies, installing, and connections, along with miscellaneous work associated with this activity. The chain replacement requires the installation of electrical limit switches to be integrated with the existing motor starter. Tainter gate painting/repair The work consists of the structural steel work required for repair of the Tainter gate including bottom strut replacement, crack repair, removal and reinstallation of the side seals, structural member replacement and miscellaneous member replacement. The work includes, but is not to, temporary shoring of tainter gates during construction activities, replacement of associated rivets and/or bolts with high strength bolts, welding and non-destructive testing of welds, and containment, sandblasting, cleaning and painting of the exterior and interior of the Tainter gates. Service bridge painting/repair. The work includes all equipment, labor and materials required for miscellaneous structural steel repairs, containment, sandblasting, cleaning and painting of all the steel surfaces of the steel service bridge. The existing paint on the bridge is lead based paint. Work also includes removal and replacement of bridge bearing bolts, potential gusset plate replacement, crane rail and clip removal, clip replacement, rail re- alignment, and walkway grating replacement. Service bridge column repairs Work consists of column replacement at seven piers, with four columns at each pier. The concrete beams and slab that frame into columns and support bridge bearings are also to be replaced. Work includes, but is not , installation of contractor shoring system of bridge spans to be used during demolition, concrete demolition, installation of cast-in- concrete, and installation of structural steel and miscellaneous metals. SOLICITATION: The solicitation is expected to be on or about June 15, 2023. The proposal date and time will be contained in the solicitation . For changes to the issue date or any other changes to the information in this synopsis, potential offerors are responsible to check the information on the System for Management at www.sam.gov/. This solicitation will be posted on SAM, which can be accessed at www.sam.gov/. Paper copies of this solicitation and its amendments will not be or issued. Telephone, written, facsimile, or e-mail requests for the solicitation or the Interested Vendor List will not be honored. This notice does not obligate the Government to a contract, nor does it obligate the Government to pay for proposal preparation costs. SYSTEM FOR MANAGEMENT (SAM.gov): Be advised that all interested parties MUST be registered in the System for Management (SAM) Database at https://www.sam.gov, in order to receive notification and/or changes to the solicitation, and to receive a contract . The Interested Vendor List will be activated and may be accessed and printed from this web site. Prospective offerors who would like their company name included on the Bidders Mailing List (plan holders list) may do so on the SAM website under Interested Vendor List. Potential offerors are responsible for monitoring this site for the release of the solicitation and any other pertinent information and for downloading their own copy of the solicitation . *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$75,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
100
Bidding Soon
1,486
All Active Projects
649
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 27, 2023

August 28, 2023

img_map_placeholder

To Be Determined, Clarksville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.