BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a mixed-use development in Pomona, California. Completed plans call for the renovation of a educational facility; and for site work for a water / sewer project.

Trustees of The California State University are requesting Statements of Qualifications (SOQ) from interested and qualified design-builders (Respondents) to provide design, preconstruction, and design-build construction services for the above-named Project. The Trustees will select a design-build team consisting of a general contractor and architect (Design-Builder) using a two-step process: (1) this Request for Qualifications (RFQ) from which Respondents may submit SOQ to the Trustees, and (2) the Request for Proposals (RFP) which the Trustees will issue to the shortlisted firms. A technical review committee shall review the respondents' SOQ and, based on the criteria identified in the RFQ, the committee shall select no more than five finalists to receive the Request for Proposals. Selection of the winning Proposer will be based on qualifications and proposed fees (a design competition is not utilized). Collaborative Design-Build is a two-phased delivery process: Design Phase and Design-Build Phase, and the Trustees will issue a separate contract for each phase.The Project consists of: 1. The Direct Construction Cost Budget is approximately $65,000,000. An updated budget that will be used as the basis of the fee proposal will be established in the RFP. 2. Substantial completion for the Phase 2 agreement is April 8, 2026, the delivery date of the NSMV. 3. The Project generally will consist of: a. The US Maritime Administration is building five new ships (NSMV). These will be berthed at the five public maritime academies, including Cal Maritime Academy, in Vallejo, for use as a training ship when not needed by FEMA. The Boat Basin & Pier Extension project enables mooring of the NSMV and associated support elements for operations. The project has six main components: causeway and pier, small vessel boat basin, marine logistics yard, utility upgrades, demolition, and replacement of the existing breakwater and two modular buildings. The current causeway and pier will be expanded and strengthened or entirely replaced as required for the larger NSMV, including upgrades to the trestle, boat basin, addition of mooring dolphins, dredging, and upgraded utilities to support these elements and activities. b. The marine yard will be expanded by removing/relocating several smaller facilities and increasing servicing the existing paved parking area. c. Upgrades to shore power transformer, switchgear, domestic water supply, fire protection system, sanitary wastewater, and cable management systems. Relocation and rerouting of the dock boiler, gas supply, and metering and sitewide lighting upgrades. d. The project may include alternates, such as the addition of retaining walls to increase the marine yard, which may be included in the RFP and incorporated into the project during phase 1 as part of programing and validation process as determined to most efficiently make use of the allowable budget. e. Design-Build Team may be allowed to self-perform some or all the work if determined by the Trustees that the self-perform work is in the best interest of the project and if the Design-Build Team is qualified to perform the work. Other Bid Details LICENSE REQUIREMENTS A & B Bid Bond BID BOND 10.00% PAYMENT BOND 100.00% PERFORMANCE BOND 100.00% CSU Point of Contact for Information: Richard Vanzini, Program Director, 646-621-1033 Richard.vanzini@cordobacorp.com Last day to submit RFQ questions 06/13/23

Post-Bid

Educational

$65,000,000.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
103
Bidding Soon
2,238
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

December 4, 2023

img_map_placeholder

To Be Determined, Pomona, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.