BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Durango, Colorado. Completed plans call for site work for a water / sewer project.

The purpose of this project is to rehabilitate approximately 5,510 square feet of existing Primary Clarifier & Influent Channel surfaces in an operational wastewater treatment facility. Services to be provided by the Contractor will include, but will not be limited to: existing surface preparation, including minor repairs and surfacing, and installation of a layered coating with a modified polymer and polyurethane/polymeric foam. The contractor shall furnish all labor, materials, equipment, and other items necessary to complete the work in accordance with the contract documents. Question Acceptance Deadline 06/08/2023 05:00 PM EDT Questions are submitted online Yes The City of Durango reserves the right to reject any and all bids, to waive any informalities and minor irregularities in bids, and to accept the bid deemed, in the opinion of the City, to be in the best interest of the City of Durango. SCOPE OF SERVICES SCOPE OF WORK. The purpose of this project is to rehabilitate the corrosion resistant liner in the existing Primary Clarifier #2 and Fine Screen Influent Channels in an operational wastewater treatment facility. Work includes: 1. Surface preparation of interior tank and channel surfaces to an SSPC-SP13/NACE 6 standard to produce a cleaned, abraded, and sound surface with no evidence of laitance, loose concrete, contaminants, or debris. The sump in the Primary Clarifier and the Effluent Trough outlet must be covered to ensure no foreign material enters piping. 2. Collect, store, and transport spent abrasive material and existing coating to landfill. 3. Apply moisture/chemical barrier specifically developed for corrosive wastewater environments, consisting of silicone modified polyurea to interior tank walls and channel surfaces. 4. Apply surfacer consisting of low viscosity, two-component polyurethane/polymeric blend foam to interior tank and channel surfaces. 5. Apply final/chemical corrosion barrier specifically developed for corrosive wastewater environments, consisting of silicone modified polyurea to interior tank and channel surfaces. 6. The total thickness of the multi-layer liner system shall be a minimum of 500 mils. 7. The contractor will be responsible for providing representative layer and/or total coating thickness measurements. All work shall be completed under the supervision and inspection of the City Project Manager or assigned agent. Any deviation from the project or standard specifications shall be approved, in writing, in advance. Any deviation from the project or standard specifications without prior authorization shall result in the immediate suspension of work, removal of the non-compliant work at Contractor's cost, and possible termination of contract. The scheduled work period is tentatively set as July 8, 2023, through October 5, 2023 unless otherwise agreed upon by both the City of Durango, and the contractor. Work shall be accomplished as soon as practical. A. SCHEDULING. The Contractor shall schedule the reconstruction work so that the least inconvenience is caused to City staff and workflow. Prior to the pre-construction meeting, the Contractor shall provide a schedule to the City showing proposed phases and dates of work. Working Hours will be Monday through Friday, excluding holidays, from 7:30 AM to 5:00 PM unless otherwise approved.

Award

Water / Sewer

$225,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
7
Bidding Soon
142
All Active Projects
63
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 15, 2023

July 7, 2023

October 5, 2023

img_map_placeholder

105 S Camino Del Rio, Durango, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.