BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Jacksonville, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

As of August 10,2023, project was awarded to Preferred Materials Inc., awarded amount is $5,895,675.24. Counties: Duval Road Name: SR 228 (Normandy Blvd) Limits: From Lamplighter Lane to I-295 Project(s): 44535215201(*) Federal Aid No: D222063B Total Roadway Length: 1.685 Miles Contract Days: 330 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.685 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days The improvements under this contract consist of milling and resurfacing, base work, drainage improvements, curb and gutter, traffic signals, sidewalk/bicycle path, highway signing and other incidental construction on SR 228 (Normandy Blvd) in Duval County from Lamplighter Lane to I-295. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 007 Milling and Resurfacing - SR 228 Proposal Budget Estimate: $6,021,940.00 The improvements under this contract consist of milling and resurfacing, base work, drainage improvements, curb and gutter, traffic signals, sidewalk/bicycle path, highway signing and other incidental construction on SR 228 (Normandy Blvd) in Duval County from Lamplighter Lane to I-295.

Award

Roads / Highways

$5,895,675.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

173

5

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
39
Bidding Soon
668
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2023

June 24, 2023

img_map_placeholder

FL-228, Jacksonville, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.