BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2023 at 8:00 PM

Updated July 8, 2025

Site work for a water / sewer project in Fenton, Missouri. Completed plans call for site work for a water / sewer project.

This project consists of, but not limited to, cleaning and CIPP lining of 2 reaches of approximately 211 Lineal Feet of 6" Pipe, 59 reaches of approximately 8,775 Lineal Feet of 8" Pipe, 6 reaches of approximately 1,844 Lineal Feet of 15" Pipe, rehabilitation of 73 connections of the 6", 8" & 15" pipe to be CIPP lined, and rehabilitation of 61 connections on pipe not to be CIPP lined. Questions should be directed to Mr. Bob Hembrock, Executive Director, at Northeast Public Sewer District's Office. Jefferson County, Mo. 636-343-5090 Ext. 226

Bid Results

Water / Sewer

$703,758.00

Public - City

Site Work

25

21

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
89
Bidding Soon
1,232
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 17, 2023

Project location map

Multiple Locations, Fenton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.